Laserfiche WebLink
-' <br />Base <br />Total Unit <br />Price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />Cost <br />Unit Cost <br />(labor + <br />cost x <br />material) <br />quantity) <br />Supply and install only four (4)- <br />35 <br />2 inch PVC schedule 40 conduit <br />bundled in one main trench <br />10,944 <br />LF <br />13.12 <br />20.02 <br />33.14 <br />362,684.16 <br />with others for City conduit <br />Supply and install only eight (8)- <br />36 <br />2 inch PVC schedule 40 conduit <br />358 <br />LF <br />16.00 <br />40.47 <br />56.47 <br />20,216.26 <br />bundled in one main trench <br />with others for City conduit <br />Supply and install only <br />37 <br />24"X13"X12" pull box for City <br />20 <br />EA <br />388.00 <br />285.00 <br />673.00 <br />13,460.00 <br />conduit <br />38 <br />Flowable Fill <br />97,125 <br />CF <br />INCL. <br />INCL. <br />4.14 <br />402,097.50 <br />39 <br />Asphalt Mill & Resurface <br />34,583 <br />SY <br />INCL. <br />INCL. <br />17.90 <br />619,035.70 <br />40 <br />Construct Concrete Sidewalk <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$320,000 <br />320,000.00 <br />41 <br />Urban Walkway <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$225,000 <br />225,000.00 <br />42 <br />Concrete fill over FPL conduits <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$15,000 <br />15,000.00 <br />43 <br />CONTINGENCY <br />1 ALLOWANCE <br />N/A <br />NIA <br />$250,000 <br />250 000.00 <br />TOTAL BID PRICE <br />(Bid Items 1 through 43) <br />$4,406,749.09 <br />City of Sunny Isles Beach I Invitation to Bid No. 21-08-01 <br />HYPOWER, INi <br />