Laserfiche WebLink
�toIDP 5144r"' <br />Note: Some pay items are broken down into material and labor costs. The Sum of these two costs determines the total <br />unit costs. Total Unit Cost will be used to determine Base Price. Where material provided by others, material unit costs <br />to not apply. Cost that do not apply are marked "N/A". Cost included in Total Unit Cost are identified as "INCL". <br />City of Sunny Isles Beach I Invitation to Bid No. 21-08-01 <br />HYPOWER, INC. <br />Total Unit <br />Base Price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />Cost <br />Unit Cost <br />(labor + <br />cost x <br />material) <br />quantity) <br />1 Bonds and Insurance <br />1 LS <br />INCL <br />INCL <br />51 750.00 <br />51 750.00 <br />2 Mobilization <br />1 LS <br />INCL <br />INCL <br />225,500.00 <br />225,500.00 <br />3 Maintenance of Traffic <br />18 MONTHLY <br />INCL <br />INCL <br />7,670.00 <br />138,060.00 <br />4 Testing, Surveying and <br />1 LS <br />INCL <br />INCL <br />591800.00 <br />599800.00 <br />Miscellaneous <br />6 Indemnification Allowance <br />1 LS <br />NIA <br />N/A <br />$100 <br />$100 <br />SUBTOTAL DIVISION 1 <br />475,210.00 <br />r - <br />Install only one(1)-6 inch PVC <br />schedule 40 conduit bundled in <br />6 <br />one main trench with others for <br />1,374 <br />LF <br />30.00 <br />N/A <br />41,220.00 <br />FPL Utility (FPL to furnish <br />material) <br />Install only two (2)-6 inch PVC <br />schedule 40 conduit bundled in <br />7 <br />one main trench with others for <br />172 <br />LF <br />4700 <br />N/A <br />47.00 <br />8,084.00 <br />FPL Utility (FPL to furnish <br />material) <br />Install only three (3)-6 inch PVC <br />schedule 40 conduit bundled in <br />8 <br />one main trench with others for <br />20 <br />LF <br />76.00 <br />N/A <br />76.00 <br />1,520.00 <br />FPL Utility (FPL to furnish <br />material) <br />City of Sunny Isles Beach I Invitation to Bid No. 21-08-01 <br />HYPOWER, INC. <br />