My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hypower
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Hypower
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:32:41 PM
Creation date
9/28/2021 4:15:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"C <br />"(4 <br />City of Sunny Isles Beach I Invitation to Bid No. 21-08-01 <br />HYPOWER, INC. <br />Base <br />Total Unit <br />price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />- <br />Cost <br />Unit Cost <br />(labor + <br />cost x <br />material) <br />quantity) <br />Install only 50" splice box for <br />17 <br />FPL Utility (FPL to furnish <br />6 <br />EA <br />676.00 <br />NIA <br />676.00 <br />4,056.0 <br />material <br />78 <br />Install only 30"handhole for FPL <br />26 <br />EA <br />427.00 <br />NIA <br />427.00 <br />11,102.00 <br />Utility (FPL to furnish material) <br />Install only concrete pad for <br />19190 <br />transformers for FPL Utility <br />62 <br />EA <br />429.00 <br />NIA <br />429.00 <br />26,598.00 <br />(FPL to furnish material) <br />Install only 18"x24" service pull <br />20 <br />boxes for FPL Utility (FPL to <br />238 <br />EA <br />321.00 <br />NIA <br />6,398.00 <br />furnish material) <br />Supply and install only two (2)4 <br />inch PVC schedule 40 conduit <br />21 <br />bundled in one main trench <br />3,125 <br />LF <br />14.00 <br />25.61 <br />39.61 <br />123,781.25 <br />with others for Atlantic <br />Broadband <br />Supply and install only four (4)- <br />4 inch PVC schedule 40 conduit <br />22 <br />bundled in one main trench <br />4,797 <br />LF <br />39.95 <br />61.20 <br />293,576.40 <br />with others for Atlantic <br />Broadband <br />Supply and install only six (6)-4 <br />inch PVC schedule 40 conduit <br />23 <br />bundled in one main trench <br />350 <br />LF <br />24.00 <br />60.00 <br />84.00 <br />29,400.00 <br />with others for Atlantic <br />Broadband <br />Supply and install only eight (8)- <br />4 inch PVC schedule 40 conduit <br />24 <br />bundled in one main trench <br />10 <br />LF <br />42.00 <br />79.27 <br />121.27 <br />1,212.70 <br />with others for Atlantic <br />Broadband <br />City of Sunny Isles Beach I Invitation to Bid No. 21-08-01 <br />HYPOWER, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.