My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AUM Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
AUM Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:28:21 PM
Creation date
9/28/2021 4:19:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID FORM (revised) <br />Note: Some pay items are broken down into material and labor costs. The Sum of these two costs determines the total <br />unit costs. Total Unit Cost will be used to determine Base Price. Where material provided by others, material unit costs <br />to not apply. Cost that do not apply are marked "N/A". Cost included in Total Unit Cost are identified as "INCL". <br />PAY ITEM <br />Total Unit <br />Base Price <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />Quantity <br />- 01020 <br />Unit <br />Cost <br />Unit Cost <br />(labor+ <br />cost x <br />material) <br />quantity) <br />1 Bonds and Insurance 1 LS INCL INCL �,l QQ'%� �6/ OGk'l. � <br />2 Mobilization 1 LS INCL INCLZff <br />}ZS 90.5 Jr <br />3 Maintenance of Traffic 18 MONTHLY INCL INCL /O OOD.O S <br />4 Testing, Surveying and 1 LS INCL INCL <br />Miscellaneous 5Dmo00 5'000.0 <br />5 Indemnification Allowance 1 LS NIA NIA $100 $100 <br />SUBTOTAL DIVISION 1 /,Ol6, 90 b. <br />Install only one(1)-6 inch PVC <br />schedule 40 conduit bundled in <br />6 one main trench with others for 11374 LF X50. OO NIA 4.50.00OQ 6g O <br />FPL Utility (FPL to furnish <br />material) <br />Install only two (2)-6 inch PVC <br />schedule 40 conduit bundled in <br />7 one main trench with others for 172 LF 1100,00 NIA 4100,00 11 20a49 <br />FPL Utility (FPL to furnish / <br />material) <br />Install only three (3)-6 inch PVC <br />schedule 40 conduit bundled in <br />8 one main trench with others for 20 LF yya00 NIA 4250.L099 5 ppp. pp <br />FPL Utility (FPL to furnish <br />material) <br />PAY ITEM Total Unit Base Price <br />Quantity Unit Labor Unit Material Cost (total unit <br />PER 01020 Cost Unit Cost (labor+ cost <br />material) <br />quantity) <br />Install only one (1)-2 inch PVC <br />schedule 40 conduit bundled in <br />9 one main trench with others for 1,085 <br />FPL Utility (FPL to furnish <br />material) <br />LF <br />N/A �Q,ZQ.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.