Laserfiche WebLink
I/ <br />only one (1)-2,29 <br />Base <br />FSupplystall <br />edule 40 conduit6,330 <br />main trench <br />Total Unit <br />LF <br />S_ QQ <br />y.yq.,O <br />Labor Unit <br />//e <br />��lr <br />Cost <br />AT&T <br />Cost <br />Unit Cost <br />(labor+ <br />PSupply2and <br />Supply and install only two (2)-2 <br />material) <br />cost x <br />30 <br />inch PVC schedule 40 conduit <br />bundled in one main trench <br />3,208 <br />LF�/QOOg, <br />y <br />�Z�g. <br />3Z <br />1sj•/ Q/0 <br />with others for AT&T <br />35 <br />2 inch PVC schedule 40 conduit <br />10,944 <br />LF <br />31 <br />Supply and install only 10"x 15'i <br />handhole for AT&T <br />84 <br />EA <br />(50000/y5, <br />52 <br />/6456 52 <br />/39213. <br />/ <br />with others for City conduit <br />32 <br />Supply and install only 17"x 30" <br />handhole for AT&T <br />48 <br />EA <br />3 000 0 <br />(35y 62y <br />3s9 62?09 <br />Da/. <br />36 <br />2 inch PVC schedule 40 conduit <br />bundled in one main trench <br />358 <br />LF <br />33 <br />Supply and install only 30"x <br />48"x36" handhole for AT&T <br />16 <br />EA <br />y00D0Q <br />y o Cr/ 39 <br />/ p y / , 3q�Zg, <br />9 <br />662. <br />/ <br />Supply and install only two (2)- <br />37 <br />24"X1 3"X12" pull box for City <br />20 <br />EA <br />34 <br />2 -inch PVC schedule 40 conduit <br />293 <br />LF <br />X30. DD <br />g, 3 2 <br />X38.32i/ <br />Z <br />bundled in one main trench <br />38 <br />Flowable Fill <br />97,125 <br />CF <br />INCL. <br />with others for City conduit <br />39 <br />Asphalt Mill & Resurface <br />343583 <br />SY <br />I/ <br />Base <br />Total Unit <br />Price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />Cost <br />Unit Cost <br />(labor+ <br />PSupply2and <br />material) <br />cost x <br />quantity) <br />install only fR(4). <br />35 <br />2 inch PVC schedule 40 conduit <br />10,944 <br />LF <br />+5626 A9 <br />bundled in one main trench <br />/ <br />with others for City conduit <br />Supply and install only eight (8)- <br />36 <br />2 inch PVC schedule 40 conduit <br />bundled in one main trench <br />358 <br />LF <br />6000i32•'rQg2• <br />Z <br />33,039. <br />with others for City conduit <br />Supply and install only <br />37 <br />24"X1 3"X12" pull box for City <br />20 <br />EA <br />12� oo <br />4Sgp. 6�( <br />I� /0, 6 <br />35 Bl2 <br />conduit <br />38 <br />Flowable Fill <br />97,125 <br />CF <br />INCL. <br />INCL.C(/6n� <br />39 <br />Asphalt Mill & Resurface <br />343583 <br />SY <br />INCL. <br />INCL. <br />+20 OO <br />6j1 6tx <br />40 <br />Construct Concrete Sidewalk <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$375,000 <br />3 ;OOD <br />41 <br />Urban Walkway <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$2501000 <br />?50 ,fJO <br />42 <br />Concrete fill over FPL conduits <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$15,000 <br />151 ppp, <br />43 <br />CONTINGENCY <br />1 ALLOWANCE <br />N/A <br />N/A <br />$375,000 <br />3 j pV, <br />I/ <br />