My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rohl Global Networks
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Rohl Global Networks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:53:19 PM
Creation date
9/28/2021 4:49:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID FORM (revised) <br />Note: Some pay items are broken down into material and labor costs. The Sum of these two costs determines the total <br />unit costs. Total Unit Cost will be used to determine Base Price. Where material provided by others, material unit costs <br />to not apply. Cost that do not apply are marked "N/A". Cost included in Total Unit Cost are identified as "INCL". <br />- Total Unit Base Price <br />Quantity Unit Labor Unit Material Cost (total unit <br />- - Cost Unit Cost (labor + cost x <br />material) quantity) <br />1 <br />Bonds and Insurance <br />1 LS <br />INCL <br />INCL <br />$200,000.00 <br />$200,000.00 <br />2 <br />Mobilization <br />1 LS <br />INCL <br />INCL <br />$180,000.00 <br />$180,000.00 <br />3 <br />Maintenance of Traffic <br />18 MONTHLY <br />INCL <br />INCL <br />$10,000.00 <br />$180,000.00 <br />4 <br />Testing, Surveying and <br />Miscellaneous <br />1 LS <br />INCL <br />INCL <br />$75,000.00 <br />$75,000.00 <br />5 <br />Indemnification Allowance <br />1 LS <br />N/A <br />N/A <br />$100 <br />$100 <br />SUBTOTAL DIVISION 1 <br />Install only one(1)-6 inch PVC <br />schedule 40 conduit bundled in <br />6 <br />one main trench with others for <br />1,374 <br />LF <br />$40.24 <br />N/A <br />$40.24 <br />$55,289.76 <br />FPL Utility (FPL to furnish <br />material) <br />Install only two (2)-6 inch PVC <br />schedule 40 conduit bundled in <br />7 <br />one main trench with others for <br />172 <br />LF <br />$75.45 <br />N/A <br />$75.45 <br />$12,977.40 <br />FPL Utility (FPL to furnish <br />material) <br />Install only three (3)-6 inch PVC <br />schedule 40 conduit bundled in <br />8 <br />one main trench with others for <br />20 <br />LF <br />$105.63 <br />N/A <br />$105.63 <br />$2112.60 <br />FPL Utility (FPL to furnish <br />material) <br />Total Unit <br />Base Price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />Cost <br />Unit Cost <br />(labor + <br />cost x <br />material) <br />quantity) <br />Install only one (1)-2 inch PVC <br />schedule 40 conduit bundled in <br />9 one main trench with others for <br />1,085 <br />LF <br />$26.41 <br />N/A <br />$26.41 <br />$28,654.85 <br />FPL Utility (FPL to furnish <br />material) <br />
The URL can be used to link to this page
Your browser does not support the video tag.