My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rohl Global Networks
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Rohl Global Networks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:53:19 PM
Creation date
9/28/2021 4:49:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Supply and install only one (1)-2 <br />Base <br />29 <br />inch PVC schedule 40 conduit <br />bundled in one main trench <br />6,330 <br />LF <br />$26.41 <br />$3.93 <br />$30.34 <br />$192,052.20 <br />with others for AT&T <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />• <br />Supply and install only two (2)-2 <br />Cost <br />Unit Cost <br />(labor + <br />30 <br />inch PVC schedule 40 conduit <br />3,208 <br />LF <br />$45.27 <br />$7.86 <br />$53.13 <br />$170,441.04 <br />bundled in one main trench <br />quantity) <br />with others for AT&T <br />31 <br />Supply and install only 10"x 15" <br />84 <br />EA <br />$565.88 <br />$31.29 <br />$597.17 <br />$50,162.28 <br />handhole for AT&T <br />32 <br />Supply and install only 17"x 30" <br />48 <br />EA <br />$754.50 <br />$351.37 <br />$1105.87 <br />$53,081.76 <br />36 <br />handhole for AT&T <br />358 <br />LF <br />$181.08 <br />$31.44 <br />$212.52 <br />$76,082.16 <br />33 <br />Supply and install only 30"x <br />16 <br />EA <br />$2515.00 <br />$711.26 <br />$3,226.26 <br />$51,620.16 <br />48"x36" handhole for AT&T <br />Supply and install only two (2)- <br />34 <br />2 -inch PVC schedule 40 conduit <br />293 <br />LF <br />$45.27 <br />$7.86 <br />$53.13 <br />$15,567.09 <br />bundled in one main trench <br />38 <br />with others for City conduit <br />97,125 <br />CF <br />INCL. <br />INCL. <br />$5.75 <br />$558,468.75 <br />• <br />Base <br />Total Unit <br />Price <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />• <br />1 <br />Cost <br />Unit Cost <br />(labor + <br />material) <br />cost x <br />quantity) <br />Supply and install only four (4)- <br />35 <br />2 inch PVC schedule 40 conduit <br />bundled in one main trench <br />10,944 <br />LF <br />$75.45 <br />$15.72 <br />$91.17 <br />$997,764.48 <br />with others for City conduit <br />Supply and install only eight (8)- <br />36 <br />2 inch PVC schedule 40 conduit <br />358 <br />LF <br />$181.08 <br />$31.44 <br />$212.52 <br />$76,082.16 <br />bundled in one main trench <br />with others for City conduit <br />Supply and install only <br />37 <br />24"X13"X12" pull box for City <br />20 <br />EA <br />$534.44 <br />$207.92 <br />$742.36 <br />$14,847.20 <br />conduit <br />38 <br />Flowable Fill <br />97,125 <br />CF <br />INCL. <br />INCL. <br />$5.75 <br />$558,468.75 <br />39 <br />Asphalt Mill & Resurface <br />34,583 <br />SY <br />INCL. <br />INCL. <br />$15.00 <br />$518,745.00 <br />40 <br />Construct Concrete Sidewalk <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$375,000 <br />41 <br />Urban Walkway <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$250,000 <br />42 <br />Concrete fill over FPL conduits <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$15,000 <br />43 <br />CONTINGENCY <br />1 ALLOWANCE <br />N/A <br />N/A <br />$375,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.