My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ferreira Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Ferreira Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:57:31 PM
Creation date
9/28/2021 4:54:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FERREM <br />FPL Duct Bank Experience <br />Work Order No. WR10412453 — 698 West Flagler St, Miami FL (FPL Production Lead — Mr. David Fite] <br />T <br />.9'. k7��O <br />Scope: Installation of electrical duct bank and several manholes across numerous underground utilities and in a high <br />traffic area and in Miami, FI. <br />Work Order No. WR10412453 — 698 West Flagler St, Miami FL [FPL Production Lead — Mr. David Fitej <br />Illy E I I'na <br />Id <br />Scope: Installation of electrical duct bank and several manholes across numerous underground utilities, adjacent to <br />ongoing building construction in Coral Gables, FI. <br />
The URL can be used to link to this page
Your browser does not support the video tag.