My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ferreira Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Ferreira Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:57:31 PM
Creation date
9/28/2021 4:54:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T6442 - 47th Ave North <br />Ferreira Construction Company, Inc. (General Contractor) <br />Miami, FL <br />_ <br />M -:Z;" <br />46 4 <br />OWNER: <br />FDOT District 6 <br />PROJECT VALUE: <br />$ 12,892,744.00 <br />DATE COMPLETED: <br />May, 2020 <br />W W W.FERREIRACONSTRUCTION.COM <br />�RRRRlRA <br />- 1,. A�- - <br />+.C;__ I- <br />e <br />m Z� <br />.; <br />� <br />J' N. I. <br />Ferreira's scope of work included providing all labor, equipment, and materials to <br />complete all the sitework. Over 3 miles of roadway reconstruction, full 4 lane divided <br />with continuous drainage, street lighting, traffic signalization, a culvert extension, <br />bridge widening and the construction of approximately 2 miles of 16" water main with <br />cross connections and abandonment of the old main as a joint project with Miami -Dade <br />Water & Sewer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.