Laserfiche WebLink
Sample <br />Projects <br />(Completed ) <br />Project Number: 001 <br />Project Name: 1-595 to Turnpike Northbound Ramp —T7 Ramp <br />Owner: Florida Department of Transportation <br />Contractor: <br />Maytin Engineering Corp. <br />Contact: <br />Roly Maytin, PE <br />Address: <br />13900 NW 112th Ave <br />■ Excavation <br />Hialeah Gardens, FL 33018 <br />Phone: <br />305-827-4545 <br />Fax: <br />305-827-4547 <br />Completed: March 2014 <br />Horizon Contractors, Inc. <br />Contract Amount: $495,000 <br />Xavier Salvat, PE <br />Contract Scope: <br />8175 West 32nd Ave — Suite 2 <br />■ Excavation <br />3500 CY <br />■ Embankment <br />18,000 CY <br />■ Limerock (Finish Grade) <br />12,000 SY <br />■ Solid Pipe (Various Diameters) <br />750 LF <br />■ Drainage Structure <br />10 EA <br />■ Asphalt <br />o Traffic Level D (PG 76-22) <br />420 TN <br />o FC -9.5 <br />80 TN <br />Project Number: 002 <br />Project Name: Phase V1—Storm Water Improvements <br />Owner: Village of EI Portal <br />Contractor: <br />Horizon Contractors, Inc. <br />Contact: <br />Xavier Salvat, PE <br />Address: <br />8175 West 32nd Ave — Suite 2 <br />Hialeah, FL 33018 <br />Phone: <br />305-828-2050 <br />Fax: <br />305-820-0905 <br />Completed: April 2014 <br />Contract Amount: $35,000 <br />Contract Scope: <br />■ Solid Pipe (Various Diameters) 190 LF <br />■ Drainage Structure 2 EA <br />■ Asphalt <br />o Traffic Level C 40 TN <br />