|
El
<br />EJ
<br />ASHBRITT, INC. RESPONSE TO THE CITY OF SUNNY ISLES BEACH, FL
<br />INVITATION TO BID NO. 14 -06-02 EMERGENCY DEBRIS CLEARING AND REMOVAL OPERATIONS
<br />p
<br />AshBritt _ _ Daniel D'Emidra
<br />Site Project LuperintendintiQjuhli& Control
<br />Hurricane Dennis, July 2005, Escambia County, FL
<br />Managed the Oak Grove dump site. Operated the tub grinder and processed over 150.000 cubic yards
<br />of debris.
<br />Hurricane Frances, Sept. 2004, Port St. Lucie, FL
<br />Project Manager in charge of the removal of over 500,000 cubic yards of storm debris using 100
<br />trucks and tree crews.
<br />1990-1992 Bodkins Construction, Davie, FL
<br />Night shift supervisor for processing using Diamond Z tub grinder after Hurricane Andrew. Rubber
<br />tired front -end loader operator for various construction projects. Bulldozer operator for various
<br />construction projects.
<br />Professional Certifications and Qualifications
<br />• OSHA 40 Hazardous Waste Operations and Emergency Response Training
<br />• Class A Commercial Driver's License
<br />• DOT Traffic Safety Course Certification
<br />• U.S. Army Corps of Engineers - Construction Quality Management for Contractors Certification
<br />• FEMA NIMS ICS -100 Introduction to the Incident Command System
<br />• Mechanic/Welder
<br />Education and Training
<br />Miramar High School Miramar, FL
<br />C]AShl3ritt _ Richard Bensh_ -
<br />�^" .Project Manager/Site Project Superiirtendent
<br />Professional Experience
<br />1994 — present AshBritt, Inc., Deerfield Beach, FL
<br />Project manager and equipment operator for many disaster recovery operations.
<br />Select Projects
<br />Winter Ice Storm Pax, Feb. 2014, Sumter County & The City of Sumter, SC
<br />Project Manager in charge of overall project operational responsibility for collection, transportation,
<br />and disposal or recycling of 130.000 cubic yards of vegetative debris following Winter Ice Storm
<br />Pax. Setup and deployed more than 15 crews throughout the 2 projects. Setup and operated 1
<br />temporary debris sites for storm - generated debris. Mitigated more than 13,000 hazardous trees and
<br />limbs from public property.
<br />Additional Proiect Manatzement Experience for the followine disaster events
<br />Hurricane Sandy, Oct. 2012, Ventnor, NJ; Weymouth, NJ; Barnegat, NJ; and Ocean, NJ
<br />Snow Storm, Oct. 2011, Monson, MA
<br />Hurricane Irene, Sept. 2011, Emporia, VA
<br />Tornado, May 2011, Fayetteville, NC
<br />Tornado, May 2011, Glade Springs VA
<br />Snow Storm, Feb. 2010, Baltimore, MD
<br />Asbestos Removal, Feb. 2010, Orange County, TX
<br />Hurricane Ike, Sept. 2008, Jersey Village, TX
<br />Hurricane Wilma, Oct. 2005, Parkland, FL
<br />Supervisor and equipment operator at the Lox Road debris processing site.
<br />Hurricane Katrina, Sept. 2005, Coral Gables, FL
<br />Supervisor and equipment operator at the debris processing site.
<br />Hurricane Dennis, July 2005, Escambia County, FL
<br />Equipment operator at the Oak Grove dump site. Operated the tub grinder and processed over
<br />150,000 cy of debris.
<br />Hurricane Frances, Sept. 2004, Boca Raton, FL
<br />Supervisor of the processing site.
<br />Canal Dredging Project, 2004, Miami, FL
<br />Equipment Operator
<br />Ice Storm, 2004, Sumter, SC
<br />Processed over 100,000 cy of debris.
<br />Hurricane Isabel, Sept. 2003, Hampton, VA
<br />Operated the tub grinder, processing over 800,000 cy of debris.
<br />F5 Tornado, May 1999, Oklahoma City, OK
<br />Operated the tub grinder, processing all burnable debris.
<br />Professional Certifications and Qualifications
<br />Q AshBritt
<br />Cl E� Page S2 Rey Management Assigned To Sunny Isles Beach
<br />
|