My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Step 2
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2014 4:56:57 PM
Creation date
7/21/2014 4:51:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Step 2
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. PROJECT SCHEDULE <br />II Gateway Pedestrian Bridge <br />LOYI -twN iarchitects <br />Sunny Isle, Florida ' <br />congtructfon <br />group <br />ID Task Name Duration 'Start Finish I Julv Se tember November Janua March MaV Jul <br />M ( B E M B E M B E M B E M B E M B E M B <br />0 Gateway Park Preliminary Bid Schedule 249 days Thu 7/17/14 Tue 6/30/15 <br />1 <br />2 City Commission Award 1 day Thu 7/17/14 Thu 7/17/14 <br />3 Issue N.T.P 1 day Fri 8/1/14 Fri 8/1/14 <br />4 Survey 5 days Mon 8/4/14 Fri 8/8/14 <br />5 Geotechnical Investigation/ Report 5 days Mon 8/4/14 Fri 8/8/14 <br />6 Design & Preparation of Permit Drawings 75 days Mon 8/11/14 Fri 11/21/14 <br />7 Owner's Review/ Approval of Final Design 5 days Mon 11/24/14 Fri 11/28/14 <br />8 Submit Drawings for Bldg. Dept. Approval 1 day Mon 12/1/14 Mon 12/1/14 <br />9 Review/ Approval by Bldg. Dept. 30 days Tue 12/2/14 Mon 1/12/15 <br />10 Permit Approval & Issuance 1 day Tue 1/13/15 Tue 1/13/15 <br />11 Preparation of Shop Drawings Submittals 20 days Mon 12/1/14 Fri 12/26/14 <br />12 Review/ Approval of Shop Drwgs by A/E 10 days Mon 12/29/14 Fri 1/9/15 — <br />13 Submission of Shop Drwgs to Bldg Dept 1 day Wed 1/14/15 Wed 1/14/15 <br />14 Review/ Approval of Shop Drgs by Bldg Dept 10 days Thu 1/15/15 Wed 1/28/15 <br />15 Preparation of MOT Plans 10 days Wed 12/31/14Tue 1/13/15 <br />16 Submission of MOT plans to City/ County 1 day Wed 1/14/15 Wed 1/14/15 <br />17 Review & Approval of MOT by County 10 days Thu 1/15/15 Wed 1/28/15 <br />18 Release Shop Drgs for fabrication 1 day Mon 1/12/15 Mon 1/12/15 <br />i <br />19 Fabrication of Steel Bridge & associated items 57 days Tue 1/13/15 Wed 4/1/15 <br />20 Fabrication of Elevators 36 days Tue 1/13/15 Tue 3/3/15 <br />21 Material Procurement 7 days Tue 1/13/15 Wed 1/21/15 <br />22 Procurement of Light Fixtures & Electrical Items 30 days Tue 1/13/15 Mon 2/23/15 <br />23 Construction 120 days Wed 1/14/15 Tue 6/30/15 <br />24 Mobilization 5 days Wed 1/14/15 Tue 1/20/15 <br />25 Install Erosion Control Measures 5 days Wed 1/21/15 Tue 1/27/15 <br />26 MOT set up / placement 5 days Thu 1/29/15 Wed 2/4/15 <br />27 Site work/ Utilities 15 days Thu 2/5/15 Wed 2/25/15 <br />28 Underground Rough Electrical 10 days Thu 2/26/15 Wed 3/11/15 <br />29 Construction of new Elevator Towers 30 days Thu 3/12/15 Wed 4/22/15 <br />30 Rough Electrical above ground 10 days Thu 4/23/15 Wed 5/6/15 <br />31 Installation of Bridge Structural Members 15 days Thu 4/23/15 Wed 5/13/15 <br />32 Install Framing and perforated panels 25 days Thu 5/7/15 Wed 6/10/15 <br />33 Concrete pour over Metal Deck 2 days Thu 5/14/15 Fri 5/15/15 <br />34 Installation of Elevators 15 days Thu 5/14/15 Wed 6/3/15 <br />35 Installation of Chain Link Fence/ Railings 5 days Thu 5/14/15 Wed 5/20/15 <br />36 Installation of Decorative Panels 5 days Thu 5/21/15 Wed 5/27/15 <br />37 Finish Electrical 5 days Thu 5/21/15 Wed 5/27/15 <br />38 Landscaping 8 days Thu 5/21/15 Mon 6/1/15 <br />39 Painting & Finishes 10 days Thu 6/11/15 Wed 6/24/15 <br />40 Final Inspections 3 days Thu 6/25/15 Mon 6/29/15 I <br />41 Substantial Completion 1 day Tue 6/30/15 Tue 6/30/15 <br />Tue 6/24/14 Page 1 <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.