My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Link Construction Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Step 2
>
Link Construction Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2014 4:56:57 PM
Creation date
7/21/2014 4:51:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Step 2
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXIST. PUBLIC <br />STORAGE BLDG. <br />O F- <br />PARTIAL ROAD LANE CLOSURE DURING <br />STEEL BRIDGE INSTALLATION <br />PEDESTRIAN T 1 <br />BRIDGE ABOVE I I <br />I I <br />I <br />I I <br />I I <br />SOUTH ELEVATOR I I <br />TOWER <br />I I <br />llin II <br />-I <br />c <br />W <br />SUNNY ISLES BEACH BLVD. <br />N.E. 163 ST. (WEST BOUND) <br />0Ll ❑❑ r- t - - -j- j - - -- i j <br />Ell D <br />i <br />i <br />i <br />® ® - -- ---- - - - - - GATEWAY PARK - -- I <br />— r — <br />I <br />I <br />I <br />® ® j <br />C7 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />SUNNY ISLES BEACH BLVD, <br />N.E. 163 ST. (EAST BOUND) <br />❑ ❑ ❑ ❑ ❑ ❑ _ ❑ ❑ ❑ ❑ ❑ <br />PRELIMINARY MOT PLAN - PARTIAL ROAD CLOSURE <br />Page 17 <br />C <br />LE-1 <br />:wi4 <br />wr 1 <br />M r, <br />0 <br />N <br />isCONTEXTUAL SITE PLAN <br />SCALE: NTS <br />FUTURE ST. TROPEZ <br />OFFICE BUILDING <br />Ennorru"inn <br />group <br />
The URL can be used to link to this page
Your browser does not support the video tag.