Laserfiche WebLink
REPRESENTATIVE PROJECT No. 2 <br />Project Name: Central District Wastewater Treatment Plant Electrical Improvements <br />Substations 7A, 8A, 9A and 10A <br />Project Owner: Miami Dade County Water and Sewer <br />Stout Client: <br />Dynalectric Florida <br />3300 Corporate Ave., Suite 100 <br />Weston, FL 33331 <br />954-624-0000 <br />Scope of Project: <br />- FPL 15KV Feeder Primary Duct Bank Installation (6 Way) <br />o 3,250 LF of 5" PVC Conduit Concrete Encased <br />- FPL 15KV Feeder Primary Duct Bank Installation (3 Way) <br />o 1,200 LF of 5" PVC Conduit Concrete Encased <br />- 480V MCC & 120V Duct Bank (6 Way / 2 Way) <br />0 725 LF of 5" PVC Conduit Concrete Encased <br />0 210 LF of 2" PVC Conduit Concrete Encased <br />- 4160 V Duct Bank (5 Way) <br />o 1,050 LF of 5" PVC Conduit Concrete Encased <br />- Fiber Optic Duct Bank (4 Way) <br />o 825 LF of 4" PVC Conduit Concrete Encased <br />- Fiber Optic Duct Bank (2 Way) <br />- FPL Manholes <br />0 10'x10'x7' FPL 6 Way Manhole (2 Each) <br />0 6'x6'x7' FPL 5 Way Manhole (7 Each) <br />Client Contact: <br />Project Completion: <br />Dynaelectric Florida <br />Alex Barrios — Project Manager <br />954-662-9779 (Cellphone) <br />abarrios@dyna-fl.com <br />June 2021 <br />