My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stout Project 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Stout Project 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 4:07:37 PM
Creation date
11/9/2021 4:06:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPRESENTATIVE PROJECT No. 1 <br />Project Name: Port Miami CRUISE TERMINAL V <br />Project Owner: Port Miami <br />Stout Client: <br />Dynalectric Florida <br />3300 Corporate Ave., Suite 100 <br />Weston, FL 33331 <br />954-624-0000 <br />Scope of Project: <br />- FPL Primary Duct Bank Installation (9 Way) <br />o 8,190 LF of 6" PVC Conduit Concrete Encased <br />- FPL Low Voltage Duct Bank Installation (2 Way) <br />o 910 LF of 2" PVC <br />- FPL Manhole <br />0 2 Way Manholes (1 Each) <br />0 4 Way Manholes (1 Each) <br />Client Contact: <br />Project Completion: <br />Dynaelectric Florida <br />Alex Barrios — Project Manager <br />954-662-9779 (Cellphone) <br />abarrios@dyna-fl.com <br />December 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.