|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME
<br />RAUL ESTEVEZ
<br />13. ROLE IN THIS CONTRACT
<br />MEP PROJECT MANAGER
<br />14. YEARS OF EXPERIENCE
<br />A. TOTAL41 B. WITH CURRENT FIRM37
<br />15. FIRM NAME AND LOCATION (CITY AND STATE)
<br />WOLFBERG ALVAREZ & ASSOCIATES / CORAL GABLES, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />COURSE WORK RELATED TO MECHANICAL ENGINEERING, VALUE
<br />ENGINEERING, CONSTRUCTION MANAGEMENT, AND HVAC
<br />ENGINEERING
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING AWARDS, ETC)
<br />With more than 40 years of experience, Mr. Estevez serves as a senior project manager and/or engineering coordinator for the
<br />programming, planning, design and construction of some of the firm’s largest projects. Mr. Estevez has managed various large-scale
<br />and complex projects such as the North Terminal Development at the Miami International Airport as well as other American Airlines
<br />projects and the $100 million VA Medical Center in West Palm Beach, FL. Through his work with public safety, aviation, transportation,
<br />and development clients, Raul has acquired a broad understanding of project management and has overseen some of the firm’s
<br />most complex projects, most of which have involved multiple decision-makers and multiple design firms.
<br />19. RELEVANT PROJECTS
<br />A
<br />(1) TITLE AND LOCATION (CITY AND STATE)
<br />DORAL POLICE DEPARTMENT SUBSTATION
<br />DORAL, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES2016 CONSTRUCTION 2018
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE: Quality Control / Engineering Coordinator - The WA team oversaw the preparation of the design criteria package and
<br />project design for a 10,000 SF police substation and master plan for 225 on-grade parking spaces and a separate 10,000-SF civic-
<br />use building with a public park. The total size of this project scope was 215,000 SF.
<br />B
<br />(1) TITLE AND LOCATION (CITY AND STATE)
<br />DORAL POLICE HEADQUARTERS
<br />DORAL, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES2016 CONSTRUCTION 2017
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE: Quality Control / Engineering Coordinator - This project consists of a 40,000-SF, two-story building to house the primary
<br />activities of the city’s police department. Additionally, the facility obtained LEED Gold Certification.
<br />C
<br />(1) TITLE AND LOCATION (CITY AND STATE)
<br />MIRAMAR POLICE HEADQUARTERS
<br />MIRAMAR, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES2014 CONSTRUCTION 2016
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE: Quality Control / Engineering Coordinator - New 77,000-SF facility has a Mediterranean design that compliments the
<br />architecture of the town center and replaced the decades-old facility rendered useless by Hurricane Wilma.
<br />D
<br />(1) TITLE AND LOCATION (CITY AND STATE)
<br />MIAMI LAKES GOVERNMENT CENTER
<br />MIAMI LAKES, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES2011 CONSTRUCTION 2013
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE: Quality Control / Engineering Coordinator - The WA team designed the 25,000-SF government center to house executive
<br />and administrative offices, council chamber, public safety department, and ancillary functions as well as a parking lot for 100
<br />parking spaces.
<br />E
<br />(1) TITLE AND LOCATION (CITY AND STATE)
<br />WASD SOUTH MIAMI HEIGHTS MAINTENANCE FACILITY
<br />SOUTH MIAMI, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES2009 CONSTRUCTION 2010
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />ROLE: Quality Control / Engineering Coordinator - WA provided program verification, master planning, architecture, mechanical
<br />and electrical engineering design services for a new 126,000-SF maintenance facility. 29
|