Laserfiche WebLink
41 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Aida M. Curtis, RLA, ASLA Principal-in-Charge a. TOTAL b. WITH CURRENT FIRM <br />38 30 <br />15. FIRM NAME AND LOCATION (City and State) Curtis + Rogers Design Studio, Inc. <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Texas A&M University <br />Bachelor of Science of Landscape Architecture, 1983 Landscape Architect: Florida, LA 0001330 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Affiliations: Member of The American Society of Landscape Architects / Awards: ASLA Certificate for Excellence in the study of Landscape <br />Architecture <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Flagler Streetscapes, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2012 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />The goals of the Flagler Streetscape project are to provide wider sidewalks, selective parallel parking/loading areas, grading/drainage <br />improvements, and landscape and hardscape enhancements that augment a vibrant downtown commercial area. The objectives for these <br />improvements are to provide areas for outdoor cafes with unified furnishings, lighting and landscaping that enhances visitor experiences <br />of the area. Cost: $5,250,000 <br />b. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />N.E. 2nd Avenue Streetscape, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />Curtis & Rogers Design Studio was hired to provide landscape architectural services as part of a team of consultants working on the <br />reconstruction of NE 2nd Ave from N 42nd Street to N 51st Street. The project consisted in reworking the street to allow for two travel <br />lanes, bike trail and some parking in critical areas. Cost: Project Budget $4,300,000 <br />c. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Naturalized Highways – Palmetto Expressway, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />We focused on naturalizing the interchanges via ecological patches that can serve as habitat rich stepping stones that allow the highway <br />to serve as a facilitator in re-establishing natural systems. These systems would introduce native plant communities, bird habitat, and <br />pollinator habitat to the urban matrix. At the same time, they will display native vegetation to motorists while enhancing their experience <br />and cognitive state by exposing them to nature. Cost: N/A <br />d. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Jackson Memorial Hospital – North Master Plan, Miami, FLorida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2018 2021 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />Our goal was to improve the campus’ physical conditions to better fit the goals of providing a pleasant, welcoming, sustainable and simple <br />way of experiencing the campus. Recognizing that in current times, hospitals become community icons, providing care, healing, education <br />and various other services, we felt the organization and simplicity of wayfinding was a crucial improvement in overall experience. Project <br />Budget: $50,000 <br />e. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Benjamon P. Grogan and Jerry L. Dove Federal Building, Miramar, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2010 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒☒ Check if project performed with current firm <br />Curtis + Rogers is pleased to have conceived the “Everglades Landscape” concept for the GSA Federal Office Building in Miramar, Florida <br />during the alternative concept phase of the project. The landscape development of this site, which had been part of the Everglades in the <br />1900’s, was based on the idea of restoring this unique environment, which still exists a few miles west of the site. The landscape elements <br />of the project are critical in that they will serve multi-faceted roles, the reestablishment of the relationship between the natural processes <br />and the human activity, the treatment of storm water and its release to replenish lost wetlands, provision of habitats for plants and animals <br />contributing to the ecological diversity. Cost: $156,000,000 <br />