|
SUMMARY OF QUALIFICATIONS
<br />Ms. Martinetti has over 18 years of engineering experience and is senior project manager for a large
<br />variety of projects related to roadway, site plan improvements, water, wastewater, and stormwater
<br />infrastructure projects in the South Florida area. Her project management experience includes design
<br />and retrofit of parks, roadways, water mains, sewage force mains, lift stations, fuel station, site design
<br />and stormwater projects as well as site planning, modifications, permitting, bidding documents,
<br />engineering during construction and project close-out.
<br />Ms. Martinetti’s highway design experience includes design for milling and resurfacing, widening,
<br />roadway reconstruction, safety improvement projects, ADA upgrades and compliance, drainage
<br />improvements, signing and pavement markings, traffic control plans, storm water pollution prevention
<br />control plans and complete streets incorporation. Her experience also includes utility coordination,
<br />participation in the quality control process, and local agency program (LAP) coordination, including
<br />agency certification assistance. Mrs. Martinetti has the advanced maintenance of traffic
<br />certification required to design and permit traffic control plans and has extensive experience
<br />with Hazard Mitigation Grant Program (HMGP), Local Agency Program (LAP) projects including
<br />Transportation Enhancement Program and Community Incentive Grant Projects (CIGP).
<br />SITE DESIGN PROJECT EXPERIENCE
<br />Hallandale CRA Resiliency Demonstration Parking Lot, Hallandale Beach, FL: The CRA owns a
<br />vacant lot at the NE corner of NE 3rd St and NE 2nd Ave and wanted to construct a parking lot that is
<br />a sustainable yet simple design in order to showcase the resiliency elements they desire from new
<br />developers. CGA provided two schematic layouts for the parking lot for the City to decide which
<br />conceptual layout they wanted. CGA met the City’s request to showcase a sustainable parking lot
<br />and to avoid drainage infrastructure by utilizing a combination of bioswales, pervious concrete, and
<br />a permeable paving system. LED lighting, electric vehicle charging stations, native plantings, and
<br />bike racks were also included in the design. Additionally, the design layout of the parking lot and
<br />spaces allows for the City’s potential conversion of the parking lot to a valet lot with mechanically
<br />stacked parking and a valet station. The plans were approved by City and CRA staff and permitting
<br />through Broward County Environmental Protection and Growth Management (EPGM) Division. 2019
<br />- Current.
<br />Sage Beach Condominium, Hollywood, FL: Project Manager and EOR for civil site design for
<br />condominium complex located east of A1A on Hollywood Beach. Design and permitting included
<br />replacement of the water main, coordination of utilities, drainage design including a closed system
<br />with drainage wells and exfiltration trench as well as offsite roadway improvements for the two sites
<br />separated by South Surf Road. All utilities along Iris Terrace, Jasmine Terrance and South Surf Road
<br />adjacent to the project site were undergrounded. The offsite improvements were coordinated with the
<br />City CRA to incorporate the design features consistent with the City’s beach beautification projects.
<br />2012 - 2016
<br />Dania Casino and Jai-Alai, Dania Beach, FL: Senior Project Manager for site design for the onsite
<br />and offsite improvements required to upgrade the existing Jai-alai facility to accommodate a casino.
<br />Site plan processing, public hearing attendance and numerous site plan meetings were included in
<br />this process to achieve site plan approval through the City. Design and permitting for new offsite
<br />water mains, onsite service connections for water and sewer, site circulation, coordination of
<br />utilities, drainage design. Redesign of Fronton Blvd, a City owned roadway, was required as part of
<br />the developers agreement with the City. A median was added as well an additional southbound lane,
<br />new parking for the adjacent park, and two new entrances to the facility. 2013 - 2016.
<br />Jenna Martinetti, PE
<br />Civil Engineer
<br />YEARS OF EXPERIENCE
<br />18
<br />YEARS WITH THE FIRM
<br />18
<br />EDUCATION
<br />B.S. Civil Engineering Florida
<br />State University Magna Cum
<br />Laude
<br />CERTIFICATIONS AND
<br />LICENSES
<br />Registered PE, State of
<br />Florida No. 69035
<br />Advanced Work Zone Traffic
<br />Control
<br />Local Agency Program
<br />& Florida Highway
<br />Administration Certification
<br />and Recertification CBT
<br />FDOT Specifications
<br />Package Preparation
<br />FDEP Stormwater, Erosion
<br />Control & Sedimentation
<br />Qualified Stormwater
<br />Management Inspector
<br />OSHA 10-Hour Construction
<br />Safety and Health
<br />PROFESSIONAL
<br />AFFILIATIONS
<br />American Society of Civil
<br />Engineers
<br />Florida Engineering Society
<br />National Society of
<br />Professional Engineers
<br />Greater Hollywood Chamber
<br />of Commerce, Board of
<br />Directors, Trustee
<br />Greater Dania Beach
<br />Chamber of Commerce
<br />Active Member
<br />Hallandale Beach Area
<br />Chamber of Commerce
<br />Active Platinum Member
<br />109
|