Laserfiche WebLink
SUMMARY OF QUALIFICATIONS <br />Mr. Kemp has four years of experience in Florida as a Traffic Engineer. His experience includes <br />analysis and design in traffic signals, traffic operations, and development of traffic studies. He is <br />knowledgeable of MUTCD, FDOT Design Standards and Specifications, Highway Capacity Manual, <br />ITE's Traffic Engineering Handbook, and highway Capacity Software including Synchro, HCS7, and <br />Sidra. <br />EXPERIENCE <br />Transportation Analyst; O'Rourke Engineering & Planning, Stuart, Florida. Sep 2017 - Jul 2021: <br />Transportation Analyst specializing in Traffic Impact Analyses, Traffic Signal Design, FDOT Access <br />Management and Permitting. <br />Traffic Engineer, Newfield, fka Pineland Prairie DRI, Martin County, Florida. 2019: Completed the <br />Traffic Impact Analyses for both the Land Use Plan Amendment and Concurrency for the proposed <br />development of regional impact located in Martin County, FL. <br />Traffic Engineer, Avenir DRI, Palm Beach County, Florida. 2018: Completed the Traffic Impact <br />Analysis in support of a substantial deviation of the approved Avenir DRI. Additional traffic engineering <br />services including but not limited to signal warrant analyses, access management analysis, internal <br />circulation, and turn lane warrants and designs. <br />Traffic Engineer, Costco, Martin County, Florida. 2021: Completed the Traffic Impact Analysis in <br />support of the proposed Costco Mixed-Use development in Martin County, FL. Coordinated with <br />FDOT to obtain approval of the proposed driveway on SR-76 (Kanner Highway). Completed the <br />Traffic Signal Design for the proposed driveway on SR-76. <br />Traffic Engineer, City of Lake Park, Palm Beach County, Florida. 2020: Took inventory and reviewed <br />the existing signing and striping plan in relation to an existing school zone. Proposed additions and <br />modifications to the existing signs, pavement markings, and crosswalks to bring the existing school <br />zone up to current standards. <br />Traffic Engineer, City of Lake Park, Palm Beach County, Florida. 2020: Analyzed the 5-leg <br />intersection of 10th Avenue and Prosperity Farms Road. Provided alternative design solutions to <br />improve traffic flow at the study intersection. <br />James Kemp, EI <br />Traffic Engineer YEARS OF EXPERIENCE <br />4 <br />YEARS WITH THE FIRM <br />< 1 <br />EDUCATION <br />Bachelor of Science, Civil <br />Engineering, Jackson State <br />University - Jackson, MS <br />CERTIFICATIONS & <br />LICENSES <br />Engineer in Training (EIT), <br />May 2017 - Present <br />PROFESSIONAL <br />AFFILIATIONS <br />ASCE <br />122