My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGA_RFQ_Sunny Isles Planning_Final Version
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
CGA
>
CGA_RFQ_Sunny Isles Planning_Final Version
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:04:38 AM
Creation date
12/3/2021 4:00:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS KeMp <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />Traffic engineer <br />City of Lake Park and Palm Beach County, FL <br />Analyzed the 5-leg intersection of 10th Avenue and Prosperity Farms Road. Provided alternative design solutions to improve traffic flow <br />at the study intersection. <br />2020 <br />Traffic engineer <br />City of Lake Park and Palm Beach County, FL <br />Took inventory and reviewed the existing signing and striping plan in relation to an existing school zone. Proposed additions and <br />modifications to the existing signs, pavement markings, and crosswalks to bring the existing school zone up to current standards. <br />2020 <br />Traffic engineer, Costco <br />Martin County, FL <br />Completed the Traffic Impact Analysis in support of the proposed Costco Mixed-Use development in Martin County, FL. Coordinated with <br />FDOT to obtain approval of the proposed driveway on SR-76 (Kanner Highway). Completed the Traffic Signal Design for the proposed <br />driveway on SR-76. <br />2021 <br />49
The URL can be used to link to this page
Your browser does not support the video tag.