My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGA_RFQ_Sunny Isles Planning_Final Version
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
CGA
>
CGA_RFQ_Sunny Isles Planning_Final Version
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:04:38 AM
Creation date
12/3/2021 4:00:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Planning <br />Redevelopment Srvcs <br />Arch Visualizations & 3D <br />Water / Wastewater Eng <br />Electrical Engineering <br />Environmental Srvcs <br />Website Development <br />GIS Mapping & Analysis <br />Surveying and Mapping <br />Urban Design Traffic Engineering Constr Admin / CEI <br />Landscape Architecture Civil Engineering Public Outreach <br />20. EXAMPLE PROJECT <br /> KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETED <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) - SF330-F - ENG_0157_BAl HARBOuR_ENGSvcS <br />In-house CGA services provided for this project: <br />2017 - Ongoing N/A <br />05 <br />BAl HARBOuR vIllAGE <br />Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and <br />all in-house services identified above. <br />Engineering Services <br />Mike Alvarez, cGc, PWlF 786.566.3562 <br />Bal Harbour Village, FL <br />Utility Compliance Officer malvarez@balharbourfl.gov <br />APPROXIMATE PROJECT SIZE: <br />PROFESSIONAL FEES: <br />CONSTRUCTION COST: <br />N/A <br />N/A <br />N/A <br />Calvin, Giordano & Associates, Inc. (CGA) began providing professional services to <br />Bal Harbour Village in 2017. Currently, CGA has a Continuing Engineering Services <br />Agreement with Bal Harbour Village in order to assist the Village in various design <br />projects and plan review services. These services include Civil Engineering, Electrical <br />Engineering, Surveying, GIS, and Construction Services. <br />On-going services for Bal Harbour Village: <br />• Building Department Public Works Plan Review and Utilities Plan Review <br />• Sunshine 811 Services – Manage Dig Tickets and Design Ticket Response <br />• Florida Department of Environmental Protection – NPDES Annual Reporting, <br />MDC MS4 TMDL Prioritization Plan and Assessment Plan <br />• Miami-Dade County Department of Regulatory and Economic Resources <br />Reporting – Sanitary Sewer System Modeling and Water Usage Reporting <br />• GIS Database Verification and Updates – Water, Sewer, Drainage, and Site <br />Lighting <br />Current Design / Construction Projects <br />• P.S. No. 1 Drainage Improvements – Project Management, Bidding, Engineering <br />During Construction, and Construction Services <br />• Phase-3(a) Infrastructure Improvements – Project Management, Civil <br />Engineering Design, Bidding, Engineering During Construction, and Construction <br />Services <br />• Phase-2(b) Water Main Replacement – Project Management, Exploratory <br />Investigation via Geotechnical Engineering and Subsurface Underground <br />Exploratory <br />• Park Dr. 16” WM Abandonment and Replacement Review – QA/QC of the design <br />plans, Construction Services. <br />X <br />X <br />X <br />X X <br />X <br />73
The URL can be used to link to this page
Your browser does not support the video tag.