Laserfiche WebLink
REFERENCE: <br />Village of Wellington <br />Tom Lundeen, PE <br />12300 Forest Hill Boulevard <br />Wellington, FL 33414 <br />p. 561.753.2454 / f. 561.904.5833 <br />e. tlundeen@wellingtonfl.gov <br />SERVICES PROVIDED: <br />Civil <br />DATE STARTED: <br />Design July 2014 <br />Construction September 2015 <br />DATE COMPLETED: <br />Design December 2014 <br />Construction December 2016 <br />TOTAL COST: <br />Design $292K <br />Construction $4.5M <br />PROJECT MANAGER: <br />Brett Oldford, PE <br />KEY STAFF: <br />Brian LaMotte, PE <br />Chris Holmes, PE <br />David Wantman, PE <br />Grace Turner <br />Stephen Cherry, PE <br />WGI was selected to provide surveying, engineering design, permitting, public <br />involvement assistance, bond assistance and construction engineering services for <br />the Saddle Trail Park (South) Neighborhood Improvement Project. Key components <br />of the project include the paving of existing shellrock roads, construction of new <br />equestrian bridle trails, construction of approximately 17,500 linear feet of 8-inch <br />new public water mains, fire hydrants, driveway connections and drainage system <br />reconstruction. Saddle Trail Park is part of Wellington’s Equestrian Preserve <br />area and presented unique obstacles for the design and construction of the <br />project. Funding for the improvements were provided through the proceeds of <br />Infrastructure Improvement Bonds with repayment being accomplished through <br />annual assessments pursuant to Chapter 170 of the Florida Statutes. <br />PROJECT HIGHLIGHTS: <br />•Surveying, permitting, public outreach, construction engineering, new <br />public water mains, drainage system reconstruction, fire hydrants, driveway <br />connections <br />Wellington, Florida <br />SADDLE TRAIL PARK (SOUTH) <br />NEIGHBORHOOD IMPROVEMENT PROJECT <br />84