My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NZ Consultants
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
NZ Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:04:59 AM
Creation date
12/3/2021 4:03:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REFERENCE: <br />Village of Wellington <br />Tom Lundeen, PE <br />12300 Forest Hill Boulevard <br />Wellington, FL 33414 <br />p. 561.753.2454 / f. 561.904.5833 <br />e. tlundeen@wellingtonfl.gov <br />SERVICES PROVIDED: <br />Civil <br />DATE STARTED: <br />Design July 2014 <br />Construction September 2015 <br />DATE COMPLETED: <br />Design December 2014 <br />Construction December 2016 <br />TOTAL COST: <br />Design $292K <br />Construction $4.5M <br />PROJECT MANAGER: <br />Brett Oldford, PE <br />KEY STAFF: <br />Brian LaMotte, PE <br />Chris Holmes, PE <br />David Wantman, PE <br />Grace Turner <br />Stephen Cherry, PE <br />WGI was selected to provide surveying, engineering design, permitting, public <br />involvement assistance, bond assistance and construction engineering services for <br />the Saddle Trail Park (South) Neighborhood Improvement Project. Key components <br />of the project include the paving of existing shellrock roads, construction of new <br />equestrian bridle trails, construction of approximately 17,500 linear feet of 8-inch <br />new public water mains, fire hydrants, driveway connections and drainage system <br />reconstruction. Saddle Trail Park is part of Wellington’s Equestrian Preserve <br />area and presented unique obstacles for the design and construction of the <br />project. Funding for the improvements were provided through the proceeds of <br />Infrastructure Improvement Bonds with repayment being accomplished through <br />annual assessments pursuant to Chapter 170 of the Florida Statutes. <br />PROJECT HIGHLIGHTS: <br />•Surveying, permitting, public outreach, construction engineering, new <br />public water mains, drainage system reconstruction, fire hydrants, driveway <br />connections <br />Wellington, Florida <br />SADDLE TRAIL PARK (SOUTH) <br />NEIGHBORHOOD IMPROVEMENT PROJECT <br />84
The URL can be used to link to this page
Your browser does not support the video tag.