12. NAME 13. ROLE IN THIS CONTRACT
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRMa. TOTAL
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />STANDARD FORM 330 (REV. 7/2021) PAGE 2
<br />a.
<br />b.
<br />c.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />e.
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Juan S. Calderon, PE, PTOE, PTP, RSP
<br />CALTRAN Engineering Group, Inc. - 790 NW 107 Avenue, Suite 200, Miami, Florida 33172
<br />MS in Civil Engineering, Florida International University,
<br />Florida 1999
<br />BS in Civil Engineering, University Santo Tomas, Bogota,
<br />Colombia, 1997
<br />Mr. Calderon has been involved in managing multiple traffics and planning engineering projects with the Florida Department of Transportation (FDOT)
<br />by providing direct support in traffic and safety projects for Districts 4 & District 6.
<br />Downtown Miami Street (Lane Elimination) SW/ SE 1st Street
<br />Provided traffic engineering services as part of feasibility study to apply Complete Streets concepts. Provided existing conditions analysis, traffic
<br />analysis for no build and build conditions, transit system operation analysis. Study recommended lane elimination and 1st bus preferential lane
<br />only in Miami-Dade County. Responsible for design to apply a Complete Streets concept; included provided signing & pavement marking plans in
<br />Project provided alternatives for improvements at interchange of SR-112/Lejeune Rd and Okeechobee Rd. Included evaluation of existing
<br />conditions, traffic data collection including big data evaluation for origin-destinations (HERE, Bluetooth, Streetlight) and operational analysis micro
<br />simulation model development. Provided documentation for Design Traffic Technical Memorandum (DTTM), assessed conceptual improvements f
<br />Served as prime consultant; included assignments such as qualitative assessments and traffic memorandums responding to public request that
<br />included congestion and safety concerns. Provided video-data collection, crash analyses, evaluation of predominant crash types and potential
<br />countermeasures for conceptual roadway and operational improvements. Contract No. CA139, FM 249796-9-32-01. Contact: Xavier Llerena, 305-
<br />Project provided alternatives for improvements at interchange of SR-112/Lejeune Rd and Okeechobee Rd. Included evaluation of existing
<br />conditions, traffic data collection including big data evaluation for origin-destinations (HERE, Bluetooth, Streetlight) and operational analysis micro
<br />simulation model development. Provided documentation for Design Traffic Technical Memorandum (DTTM), assessed conceptual improvements f
<br />- Included Traffic Impact Reviews for private applications such new hospital, revision of traffic calming ordinance, re-development of traffic calming
<br />program, assistance with roadway design consulting to improve two roundabouts at NW 38th St with NW 3rd Ave and NW 5th Ave to determine
<br />geometric modifications to enhance traffic pattern deflections within inner travel lanes. Contact: Albert J. Carbon III, P.E., City of Oakland Park, 9
<br />Iron Triangle NW 36th St/NW 42nd Ave. Interchange Feasibility Study
<br />FDOT D6, District wide Traffic Operations Consultant
<br />City of Miami Gardens
<br />City of Oakland Park
<br />Professional Engineer in Florida No. 58569, 2002
<br />Professional Traffic Operations Engineer No. 1301, 2004
<br />Professional Transportation Planner No. 20, 2007
<br />Project Manager 23 11
<br />✔
<br />✔
<br />✔
<br />✔
<br />✔
<br />2017-2018 N/A
<br />2016-2019 N/A
<br />2016-2018
<br />N/A2014-2020
<br />2017-On-going
<br />N/A
|