Laserfiche WebLink
12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 7/2021) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Juan S. Calderon, PE, PTOE, PTP, RSP <br />CALTRAN Engineering Group, Inc. - 790 NW 107 Avenue, Suite 200, Miami, Florida 33172 <br />MS in Civil Engineering, Florida International University, <br />Florida 1999 <br />BS in Civil Engineering, University Santo Tomas, Bogota, <br />Colombia, 1997 <br />Mr. Calderon has been involved in managing multiple traffics and planning engineering projects with the Florida Department of Transportation (FDOT) <br />by providing direct support in traffic and safety projects for Districts 4 & District 6. <br />Downtown Miami Street (Lane Elimination) SW/ SE 1st Street <br />Provided traffic engineering services as part of feasibility study to apply Complete Streets concepts. Provided existing conditions analysis, traffic <br />analysis for no build and build conditions, transit system operation analysis. Study recommended lane elimination and 1st bus preferential lane <br />only in Miami-Dade County. Responsible for design to apply a Complete Streets concept; included provided signing & pavement marking plans in <br />Project provided alternatives for improvements at interchange of SR-112/Lejeune Rd and Okeechobee Rd. Included evaluation of existing <br />conditions, traffic data collection including big data evaluation for origin-destinations (HERE, Bluetooth, Streetlight) and operational analysis micro <br />simulation model development. Provided documentation for Design Traffic Technical Memorandum (DTTM), assessed conceptual improvements f <br />Served as prime consultant; included assignments such as qualitative assessments and traffic memorandums responding to public request that <br />included congestion and safety concerns. Provided video-data collection, crash analyses, evaluation of predominant crash types and potential <br />countermeasures for conceptual roadway and operational improvements. Contract No. CA139, FM 249796-9-32-01. Contact: Xavier Llerena, 305- <br />Project provided alternatives for improvements at interchange of SR-112/Lejeune Rd and Okeechobee Rd. Included evaluation of existing <br />conditions, traffic data collection including big data evaluation for origin-destinations (HERE, Bluetooth, Streetlight) and operational analysis micro <br />simulation model development. Provided documentation for Design Traffic Technical Memorandum (DTTM), assessed conceptual improvements f <br />- Included Traffic Impact Reviews for private applications such new hospital, revision of traffic calming ordinance, re-development of traffic calming <br />program, assistance with roadway design consulting to improve two roundabouts at NW 38th St with NW 3rd Ave and NW 5th Ave to determine <br />geometric modifications to enhance traffic pattern deflections within inner travel lanes. Contact: Albert J. Carbon III, P.E., City of Oakland Park, 9 <br />Iron Triangle NW 36th St/NW 42nd Ave. Interchange Feasibility Study <br />FDOT D6, District wide Traffic Operations Consultant <br />City of Miami Gardens <br />City of Oakland Park <br />Professional Engineer in Florida No. 58569, 2002 <br />Professional Traffic Operations Engineer No. 1301, 2004 <br />Professional Transportation Planner No. 20, 2007 <br />Project Manager 23 11 <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />2017-2018 N/A <br />2016-2019 N/A <br />2016-2018 <br />N/A2014-2020 <br />2017-On-going <br />N/A