|
12. NAME 13. ROLE IN THIS CONTRACT
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRMa. TOTAL
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />a.
<br />b.
<br />c.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />e.
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />JESUS MUSTAFA
<br />BMA CONSULTING ENGINEERING, INC. (Pembroke Pines, Florida)
<br />B.S. CIVIL ENGINEERING,
<br />POST GRAUDATE STUDIES IN PUBLIC MANAGEMENT,
<br />PROJECT MANAGEMENT, DRAINAGE, AND STRUCTURES.
<br />CERTIFICATIONS: FHWA Bikeway Selection Guide; Pedestrian & Bicycle Information Center (Livable Communities);
<br />Highway Safety Manual (Urban & Suburban Roadways); Intersection Control Evaluation (ICE); FDOT ADVANCE TRAFFIC
<br />CONTROL; OSHA FALL PROTECTION; FDOT SPECIFICATION PREPARATION; FDOT PD&E training.
<br />Continuing Engineering Services for Traffic, Roadway & Civil Engineering
<br />Services; WA#006_HDR; Design Services for Four (4) Schools
<br />Design of Traffic Control Devices to reduce speed, upgrades Ground Mounted Flashers to Solar Mast Arm Flashers.
<br />Scope includes signing and pavement markings, signalization, structures, and sidewalk improvements. Role:Project
<br />Manager, EOR for Traffic Control, Signing and Pavement Marking, and Structures. Size: 4 miles, Cost: $1.0M
<br />The safety project included repaving and restriping the roadway, modifying existing medians, improving turning lanes,
<br />modifying existing driveway access, crosswalks, improving traffic signals, upgrading pedestrian and traffic signage.
<br />Role:Project Manager, EOR for Traffic Control, Signing and Pavement Marking, and Structures. Size: 1 mile, Cost: $1.3M
<br />The primary purpose of this project is to improve connectivity of SR 820/Pines Boulevard / Hollywood Boulevard from
<br />east of US-27 (MP 0.100) to east of Young Circle (MP 18.394) through the implementation of bicycle lanes, pedestrian
<br />paths, and traffic improvements. State Routes 820 and 823 built. Role: Project Manager and EOR for TTC, Drainage,
<br />and Miscellaneous Structures.
<br />Trail Projects assigned include: (1) Indian River Lagoon National Scenic Byway (IRLNSB) Signing Feasibility Study, (2) IRLNSB-US 1
<br />Signing Plan Update, (3) Scenic Sumter Heritage Byway (SSHB)-Rutland Park, Feasibility Study, (4) Heritage Crossroads Scenic
<br />Highway-Bunnell Pocket Park Feasibility Study, (5) SSHB-Rutland Park Kiosks, (6) National Scenic Byway District Standards 5 Cty(s).
<br />Urban 3R and Complete Streets of SR 916/NW/NE 135th Street from NW 6th Avenue to west of US 1/SR 5/Biscayne
<br />Blvd. and Safety Improvement to the intersections of SR 909/West Dixie Highway at SR 916 and SR 915/Memorial Hwy.
<br />at SR 916. Size: 3 miles. Construction cost: $6.2M. Role: Project Manager and EOR for Structures, TTC, Drainage.
<br />SR 932/NW 103 Street/W 49 Street from SR 826/Palmetto Expressway
<br />Interchange to West 12 Avenue (Miami-Dade County, Florida)
<br />SR 820/Pines Blvd./Hollywood Blvd. and SR 823/Flamingo Rd. (City of
<br />Pembroke Pines, City of Miramar, and City of Hollywood, Florida)
<br />General Engineering Consultant Services, FDOT, District 5, Florida.
<br />SR 916/ NW/NE 135th Street from NW 6th Avenue to West of US͈1/ SR͈5/
<br />Biscayne Boulevard, FDOT District 6. (Miami, Florida).
<br />FLORIDA - CIVIL
<br />GEORGIA - CIVIL
<br />ONTARIO, CANADA - ROADWAY AND STRUCTURES
<br />
<br /> Project Manager 33 9
<br />✔
<br />✔
<br />✔
<br />✔
<br />✔
<br />2019
<br />2015 2018
<br />2015
<br />20182015
<br />Part 1 2018; Part 2 on-goingPart 1 2016 Part 2 2019
<br />2019
|