Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />a. PROJECT OWNER <br />21. TITLE AND LOCATION (City and State) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />STANDARD FORM 330 (REV. 7/2021) PAGE 3 <br />(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. POINT OF CONTACT NAME <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Card Sound Road <br />Miami-Dade Dept. Of Transportation <br />CALTRAN Engineering Group, Inc.Prime ConsultantMiami, Florida <br />Provided detailed analysis of existing condition of rural two-way 12-mile segment connecting Miami-Dade <br />County with Monroe County. Included roadway conditions and characteristics assessments (typical section, <br />cross slope, transitions, pavement among others), traffic operations assessment at main intersections. <br />Conducted detailed 5-year crash analysis, supplemented by future conditions report with recommendations and <br />safety improvements to increase driver safety and improve usability of corridor for multiple modes of <br />transportation by inclusion of shared multi-use path. Included development and selection of multiple typical <br />section alternatives; evaluated construct ability, environmental impacts, safety, usability and costs. <br />Total Cost: $ 76,000.00 <br />Rolando Jimenez <br />2 <br />(305) 375-5681 <br />2015-2020