My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRAN Engineering Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(21-11-01) Professional Planning and Zoning Consulting Services including Civil and Traffic Engineering CCNA FINAL.doc
>
RESPONSES
>
CALTRAN Engineering Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:03:56 AM
Creation date
12/6/2021 10:45:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Planning and Zoning Consulting Services
Bid No. (xx-xx-xx)
21-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach |Request for Qualifications No. 21-11-01 27 <br /> REFERENCE QUESTIONNAIRE <br />It is the responsibility of the consultant/vendor to provide a minimum of three (3) different government <br />agency references other than the City of Sunny Isles Beach using this form and providing this information with <br />your submission. Failure to do so may result in the rejection of your submission. <br />Giving reference for: (Bidder) _______________________________________________________________ <br />Firm giving Reference: ____________________________________ _______________________________ <br />Address: ___________________________________________ <br />Phone: ____________________________________________ <br />Fax: ______________________________________________ <br />Email: ___________________________________________ <br />1.Q: What was the title of the contract or job assigned to Bidder? <br />A: <br />2.Q: What was the scope of work/services assigned to Bidder? <br />A: <br />3.Q: What was the dollar value of the contract? <br />A: <br />4.Q: Have there been any change orders, and if so how many? <br />A: <br />5.Q: Do they perform on a timely basis as required by the agreement? <br />A: <br />6.Q: Was the project manager easy to get in contact with? <br />A: <br />7.Q: Would you use them again? <br />A: <br />8.Q: Overall, what would you rate their performance? <br />A: <br />9.Q: Is there anything else we should know, that we have not asked? <br />A: <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and <br />correct and are made independently, free from vendor interference/collusion. <br />Name: _______________________________________ Title _____________________________________________ <br />Sign Name: __________________________________ Date: ___________________________________________ <br />Card Sound Road Feasibility Study <br />Card Sound Road Feasibility Study. Perform a feasibility study for a proposed roadway widening and provisions for bicycle/pedestrian along Card Sound Road from Monroe/Miami-Dade County line to <br />US-1 (Florida City). This study shall address environmental impacts, right-of-way, drainage, traffic operatons and safety, and cost-benefit analysis resulting from the widening project. The proposed <br />widening and bike lanes project should provide a safe operational improve facility for residents/visitors and commuters. <br />$76,093 <br />No <br />Yes <br />Yes <br />Yes <br />Excellent <br />No <br />Project ManagerRolando Jimenez, P.E. <br />11/22/21
The URL can be used to link to this page
Your browser does not support the video tag.