My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lynx Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Step 2
>
Lynx Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2014 12:14:31 PM
Creation date
7/25/2014 3:05:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Step 2
Bid No. (xx-xx-xx)
13-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUNNY ISLES GATEWAY PARK N IS I <br />L N X PEDESTRIAN ACCESS <br />X <br />NSTRUCTION <br />C; MANAGEMENT <br />Activity ID Activity Name Driginal emaining chedule Start Actual Finish Actual Qtr 3, 2014 Qtr 4, 2014 Qtr 1, 2015 Qtr 2, 2015 Qtr 3, 2015 <br />Start Finish Aug Sep Oct Nov Dec Jan Feb Mar Apr Mav I Jun I Jul I Aua I <br />Actual Level of Effort O Remaining Work ♦ ♦ Milestone <br />Actual Work Critical Remaining Work VmmmmW summary <br />Page 1 of 1 ITASK filter: All Activities <br />@ Oracle Corporation <br />Page 13 of 17 <br />v 11-Aug-14, No Phase <br />o A1000 <br />Contract Draft <br />/. <br />0 0 0 18-Aug-14 <br />Contract Draft, 18-Aug-14 <br />o A1010 <br />Contract Execution <br />1 1 0% 18-Aug-14 18-Aug-14 <br />7 <br />Contract Execution <br />PRE-DESIGN <br />v v 03=14, 1.2 PRE-DESIGN <br />-1.2 <br />W19-Aug-14 03-Sep-14 <br />00% - 711 <br />r—V 03-Sep-14, No Phase <br />60 A1020 <br />Site Investigation <br />4 4 0% 19-Aug-14 22-Aug-14 <br />❑ Site Investigation <br />Q@ A1030 <br />Survey <br />4 4 0% 25-Aug-14 28-Aug-14 <br />r-,i Survey <br />ia A1040 <br />Utility Locates - Sunshine <br />4 4 0% 29-Aug-14 03-Sep-14 <br />O Utility Locates - Sunshine <br />DESIGN <br />--T 15-Dec-14, 1.3 DESIGN <br />-1.3 <br />'11111"r-MM 77 M--"p MATT, W 71.17"W7.1711 "Mol"ir" 7"Pl. 71 " <br />v <br />N-W 15-Dec-14, No Phase <br />c;D A1050 <br />30% Concept Renderings & Geotech <br />15 15 0% 19-Aug-14 08-Sep-14 <br />30% Concept Renderings & Geotech <br />k-Q A1060 <br />60% Design Development <br />25 25 0% 09-Sep-14 13-Oct-14 <br />1 60% Design Development <br />6D A1070 <br />90 % Contract Documents & Specs <br />35 35 0% 14-Oct-14 01-Dec-14 <br />90 % Contract Documents & Specs <br />C;D A1320 <br />100% Contract Documents <br />10 10 0% 02-Dec-14 15-Dec-14 <br />O 100% Contract Documents <br />02-Jan-15, 1.4 PERMITTING <br />No Phase <br />GQ A1080 Building Department Review <br />24 24 0% 02-Dec-14 02-Jan-1 5 <br />23 23 0% 02-Dec-14 01-Jan-15 <br />02-Jan-15, No Phase <br />O Building Department Review <br />G;R A1090 <br />FDOT Review <br />23 23 0% 02-Dec-14 01-Jan-15 <br />O FDOT Review <br />G;@ A1100 <br />DERM Review <br />23 23 0% 02-Dec-14 01-Jan-15 <br />0 DERM Review <br />GQ A1110 <br />Permit Issuance <br />1 1 0% 02- Jan -15 02- Jan -15 <br />I Permit Issuance <br />MM, <br />, 08-May-15,1.5 CONSTRUCTION <br />mw�� <br />V8--May-15, <br />, 08-May-15, No Phase <br />o Potential Water Main Relocation <br />ew A1115 Potential Water Main Relocation 10 10 0% 14-Oct-14 27-Oct-14 <br />Q@ A1120 <br />Procurement of Subcontractors <br />10 10 0% 02-Dec-14 15-Dec-14 <br />� Procurement of Subcontractors <br />Q@ A1130 <br />Submittals <br />10 10 0% 02-Dec-14 15-Dec-14 <br />® Submittals <br />G@ A1140 <br />Bridge Fabrication <br />65 65 0% 16-Dec-14 16-Mar-15 <br />Bridge Fabrication <br />Q@ A1150 <br />Layout <br />3 3 0% 16-Dec-14 18-Dec-14 <br />E Layout <br />&@ A1160 <br />Foundation Auger Pilings <br />5 5 0% 19-Dec-14 25-Dec-14 <br />gM Foundation Auger Pilings <br />Q@ A1170 <br />Pile Cap <br />12 12 0% 26-Dec-14 12-Jan-15 <br />Pile Cap <br />Q@ A1180 <br />1st Level Columns <br />9 9 0% 13-Jan-15 23- Jan -15 <br />1st Level Columns <br />Q@ A1190 <br />1st Level Beams <br />7 7 0% 26- Jan -15 03-Feb-15 <br />1st Level Beams <br />Q@ A1200 <br />2nd Level Columns <br />7 7 0% 04- Feb -15 12-Feb-15 <br />2nd Level Columns <br />i@ A1210 <br />2nd Level Beams <br />7 7 0% 13-Feb-15 23-Feb-15 <br />2nd Level Beams <br />Q@ A1220 <br />Block Infill <br />7 7 0% 24- Feb -15 04-Mar-15 <br />a Block Infill <br />Q& A1225 <br />Hollow Metal Frames <br />1 1 0% 24-Feb-15 24-Feb-15 <br />1 Hollow Metal Frames <br />Q@ A1230 <br />Steel Imbeds <br />4 4 0% 05-Mar-15 10-Mar-15 <br />Steel Imbeds <br />GR A1235 <br />Bridge Erection <br />2 2 0% 17- Mar -15 18-Mar-15 <br />0 Bridge Erection <br />Q@ A1240 <br />Roof Slab <br />6 6 0% 11-Mar-15 18-Mar-15 <br />Roof Slab <br />Go A1250 <br />Elevator <br />30 30 0% 19-Mar-15 29-Apr-15 <br />= Elevator <br />gw A1255 <br />Doors <br />2 2 0% 19- Mar -15 20-Mar-15 <br />p Doors <br />Qw A1260 <br />Windows/Curtain Wall <br />5 5 0% 19-Mar-15 25-Mar-15 <br />Windows/Curtain Wall <br />im A1270 <br />Stucco Walls <br />10 10 0% 26-Mar-15 08- Apr -15 <br />O Stucco Walls <br />" A1275 <br />Wall Re-installation North Side <br />5 5 0% 09- Apr -15 15-Apr-15 <br />Wall Re-installation North Side <br />ew A1280 <br />Walkway Placement <br />7 7 0% 16-Apr-15 24- Apr -15 <br />Walkway Placement <br />Go A1290 <br />Painting <br />8 8 0% 27-Apr-15 06-May-15 <br />Painting <br />ip A1300 <br />Substantial Completion <br />2 2 0% 07-May-15 08-May-15 <br />I Substantial Completion <br />Qw A1310 <br />Certificate of Occupancy <br />0 0 0% 08-May-15 <br />♦ Certificate of Occupancy, <br />Actual Level of Effort O Remaining Work ♦ ♦ Milestone <br />Actual Work Critical Remaining Work VmmmmW summary <br />Page 1 of 1 ITASK filter: All Activities <br />@ Oracle Corporation <br />Page 13 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.