Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />above, the Contractor shall immediately comply and shall immediately replace such <br />individual with a qualified substitute to whom the City makes no objection. In the event <br />one or more individuals not listed above subsequently assumes one or more of those <br />functions listed above, the Contractor shall be bound by the provisions of this Subparagraph <br />7.7.2 as though such individuals had been listed above. <br />7.8 Prior to the commencement of any construction activity, the Contractor shall <br />provide to the City the layout, right of way designation, and work area parameters for the <br />Work. <br />7.9 The Contractor, within fifteen (15) days of commencing the Work, shall submit <br />to the City and the City's Representative for their information, the Contractor's schedule <br />for completing the Work. The Contractor's schedule shall be presented in the critical path <br />(CPM) format. The Contractor's schedule shall be revised no less frequently than monthly <br />(unless the parties otherwise agree in writing) and shall be revised to reflect conditions <br />encountered from time to time and shall be related to the entire Project. Each such <br />revision shall be furnished to the City and the City's Representative with each Application <br />for Payment. Failure by the Contractor to strictly comply with the provisions of this <br />Paragraph 7.9 shall constitute a material breach of this Contract. <br />7.10 The Contractor shall continuously maintain at the site, in an orderly fashion <br />and format acceptable to the City, for the benefit of the City and the City's Representative <br />one record copy of this Contract and all Contract Documents marked to record on a current <br />basis changes, selections and modifications made during construction. Additionally, the <br />Contractor shall maintain at the site for the City and the City's Representative the approved <br />Shop Drawings, Product Data, Samples, As -Builds and other similar required submittals. <br />Upon final completion of the Work, all of these record documents shall be delivered to the <br />City. <br />7.10.1 No less than bi-weekly, the Contractor shall conduct a Project meeting which <br />shall include the Contractor's administrative, managerial and supervisory personnel and <br />representatives of each subcontractor working on the Project site. The meeting shall address, <br />but shall not be limited to, the current status of the Work, including the current Project <br />schedule and the existence of any defective or deficient work as well as the appropriate <br />action required to correct or replace such work. The City and the City's Representative shall <br />have the right, but not the duty, to attend such weekly meetings. The Contractor shall <br />maintain detailed minutes of each such weekly meetings and shall distribute typewritten <br />copies of such minutes to the City and the City's Representative no later than the close of <br />the next workday following completion of such meeting. The Contractor shall further <br />require its Project Manager to maintain a daily job diary which shall include for each <br />work day the daily weather conditions, the identity of each subcontractor working on <br />the site, the manpower of each subcontractor working on the site, the identity of all visitors <br />to the Project site, documentary progress photographs, and any and all other information <br />reflecting any delays, hindrances, interferences, or other problems encountered or incurred <br />on the Project site. Each week the Contractor shall furnish to the City and the City's <br />Representative on a weekly basis full and complete copies of said daily job diary. <br />16 <br />