Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />Friday, 7:00 am to 5:00pm; and <br />Saturday, 9:00am to 5:00pm, with prior notice to and approval from the City. <br />The only exception to the day and time limitations set forth in 7.16.4 herein will be in the <br />event of a life safety occurrence requiring immediate corrective action. <br />7.16.6 The Contractor shall be responsible for, and shall pay the cost of, all temporary <br />facilities used, or made available, during the course of the Work. These facilities include, <br />but shall not be limited to, electric power, gas, water, sewage and sanitation, waste removal <br />and disposal, telephone, and temporary office supplies and equipment. The Contractor shall <br />timely pay for all such temporary facilities and shall coordinate the installation and removal <br />of such facilities including, but not limited to, any required coordination with any utility <br />company. Furthermore, the Contractor shall be responsible for, and shall pay the cost of, <br />any utility work which may be necessary in order to perform the Work required by the <br />Contract Documents; this responsibility includes, but is not limited to, the cost of installing, <br />moving, or relocating electric, water, sewer, gas, or other utility lines, wires, poles, pipe, and <br />any other equipment of every kind and nature. Unforeseen conditions or situations which <br />cannot be reasonably inferred from the contract documents will be individually evaluated <br />and charged to the contract contingency. <br />7.16.7 The Contractor shall be responsible for receiving, off loading, storing and <br />securing materials supplied by utility companies in furtherance of the Work. Any damage, <br />loss, or deterioration to said materials shall be the sole responsibility of the Contractor. <br />7.16.8 In the event the Contractor damages existing utility facilities while performing <br />the Work, the Contractor shall immediately repair said damages at the expense of the <br />Contractor, and in a manner acceptable to the City. Contractor shall maintain the materials <br />and equipment necessary on the Project site to ensure that remedial repairs to utility facilities <br />can be effectuated without delay. <br />7.16.9 The Contractor shall immediately notify the City of any unforeseen condition or <br />deviation from the plans that the Contractor encounters in performance of the Work. The <br />Contractor's responsibility to notify the City of said unforeseen condition or deviation <br />applies in all circumstances, and is not contingent upon whether the Contractor intends to <br />make a claim for Concealed and Unknown Conditions pursuant to Section 8.3.3. <br />7.16.10 After first giving at least seventy-two (72) hours written notice to the City and <br />the City's Representative, the Contractor shall conduct any and all testing required under <br />the Contract Documents and report the results of same to the City and the City's <br />Representative within twenty-four (24) hours of receipt unless the City or the City's <br />Representative instructs otherwise. The Contractor shall also cooperate with the City and <br />the City's Representative in the event the City or the City's Representative elects to conduct <br />testing for any purpose. The Contractor shall make the site, or any relevant portion thereof, <br />available for such testing by the City or the City's Representative and the Contractor shall <br />so schedule and coordinate its work so as not to interfere with any testing by the City or <br />the City's Representative. When requested by the City or the City's Representative the <br />Contractor shall furthermore uncover Work and otherwise assist in testing as may be <br />QZD 19 <br />