My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3279
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 12:49:51 PM
Creation date
1/19/2022 11:08:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3279
Date (mm/dd/yyyy)
12/16/2021
Description
Ratifying Agmt w/Stout Group, Inc., Golden Shores Utility Undrgrnd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />8.3.3 Claims for Concealed and Unknown Conditions -- Should concealed <br />and unknown conditions encountered in the performance of the Work (a) below the <br />surface of the ground or (b) in an existing structure be at variance with the conditions <br />indicated by this Contract, or should unknown conditions of an unusual nature differing <br />materially from those ordinarily encountered in the area and generally recognized as <br />inherent in Work of the character provided for in this Contract, be encountered, the <br />Contract Price shall be equitably adjusted by Change Order upon the written notice and <br />claim by either party made within three (3) days after the first observance of the <br />condition. As a condition precedent to the City having any liability to the Contractor <br />for concealed or unknown conditions, the Contractor must give the City and the <br />City's Representative written notice of, and an opportunity to observe, the condition <br />prior to disturbing it. The failure by the Contractor to make the written notice and claim <br />as provided in this Subparagraph shall constitute a waiver by the Contractor of any claim <br />arising out of or relating to such concealed or unknown condition. <br />8.3.4 Claims for Additional Costs — Except as prohibited in Paragraph 8.3.5 herein <br />below, if the Contractor wishes to make a claim for an increase in the Contract Price, <br />as a condition precedent to any liability of the City therefore, the Contractor shall give <br />the City's Representative and the City written notice of such claim within three (3) days <br />after the occurrence of the event, or the first appearance of the condition, giving rise to <br />such claim. Such notice must be given by the Contractor before proceeding to execute <br />any additional or changed Work. The failure by the Contractor to give such notice and <br />to give such notice prior to executing the Work shall constitute a waiver of any claim for <br />additional compensation. <br />8.3.4.1 In connection with any claim by the Contractor against the City for <br />compensation in excess of the Contract Price, any liability of the City for the Contractor's <br />cost shall be strictly limited to direct costs incurred by the Contractor plus a reasonable <br />mark-up of fifteen percent (15%) for overhead and profit consistent with Paragraph <br />10.3.3.4 below. Direct costs do not include the Contractor's home office overhead, loss <br />of efficiency, consequential damages of the Contractor, or equipment costs in excess of <br />actual equipment rental paid by the Contractor to a third party. The City shall not be <br />liable to the Contractor for claims of third parties, including Subcontractors, unless and <br />until liability of the Contractor has been established therefore in a court of competent <br />jurisdiction. <br />8.3.5 Claims for Additional Time—If the Contractor is delayed in progressing <br />any task which at the time of the delay is then critical or which during the delay becomes <br />critical, as the sole result of any act or neglect to act by the City or someone acting in the <br />City's behalf, or by changes ordered in the Work, unusual delay in transportation, <br />unusually adverse weather conditions not reasonably anticipatable, fire or any causes <br />beyond the Contractor's control, then the date for achieving Final Completion of the <br />Work shall be extended upon the written notice and claim of the Contractor to the City <br />and the City's Representative for such reasonable time as the City's Representative and <br />the City may determine plus extended, documented general conditions expenses <br />including, among other things, project management, supervision and project site <br />overhead expenses. Claims for delay can only be submitted for consideration in the event <br />they have a direct, documentable impact on the Critical Path of the project as evidenced <br />V-6 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.