Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />including additional conduit for the Cily. Upon completion of the ductbank installation <br />roadways throughout the neighborhood are to be milled and resurfaced The equipment and <br />conduit for FPL will be provided by FPL for installation by Contractor. In addition there <br />are two sub -projects for additional sidewalks along Atlantic Avenue connecting to Collins <br />Avenue, as well as for enhancements to the Urban Walkway project along Collins Avenue <br />between south of 189th Street and 191st Street as more particularly set forth in the plans <br />included with the ITB. Work includes all testing traffic control site restoration appurtenant <br />and miscellaneous items necessary for a complete functional and satisfactory installation <br />in accordance with the terms, conditions and specifications contained in Contract <br />Documents. <br />2.2 The Contractor shall perform all of the Work required, implied or <br />reasonably inferable from, this Contract as specifically set forth in the Contract <br />Documents. The Contractor agrees to comply with the City of Sunny Isles Beach <br />permitting requirements, including all licensing requirements associated with the <br />Public Works Department. <br />2.3 Unless expressly permitted or allowed by the Contract Documents, substitutions <br />of materials, articles, systems, equipment, or other components of the Work will not <br />be considered. Where substitutions are expressly permitted or allowed by the Contract <br />Documents, the Contractor must demonstrate to both the City and the City's <br />Representative that a proposed substitution is equal in substance, quality and function to <br />the material, article, or piece of equipment identified in the Contract Documents. The City <br />shall have no obligation to accept a proposed substitution and no substitution shall be allowed <br />without the prior written approval from both the City's Representative and the City. If the <br />substitution results in a savings to the Contractor, the City shall be entitled to a credit for the <br />amount saved as a result of the substitution. <br />2.4 The Contractor acknowledges and agrees that the term "flowable fill", included <br />in Contract Documents as a specific unit price, includes removal and disposal of unsuitable <br />spoil material and is subject to the City's approval before including flowable fill into the <br />Work. <br />ARTICLE Ill <br />CONTRACT TIME <br />3.1 Time <br />3.1.1 The City shall notify the Contractor in writing of the date on which the Work <br />shall begin ("the Notice to Proceed Date"). The Contractor shall commence site activities <br />on the Notice to Proceed Date, and the Work shall be carried on regularly and without <br />interruption. The Contractor shall achieve Final Completion of the Work no later than <br />eighteen (18) months after the Notice to Proceed Date. <br />3.2 Notice to Proceed <br />�fi <br />