My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 4:38:54 PM
Creation date
3/15/2022 10:46:57 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3301
Date (mm/dd/yyyy)
02/17/2022
Description
2nd Amend w/Craven Thompson for Add'l Svcs to GS Utility Undrgd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Genesis Cuevas <br />CTA Proposal No. 2018-UO3.383 (Revised) <br />July 18, 2019 <br />t age' 11 <br />Hourly Fee Schedule <br />Civil Engineering Services <br />PrincipalEngineer..............................................................................................................................................$200/Hour <br />Senior Supervising Engineer .................. ... ... .......... .............. ....... ......................................................................... <br />$185/Hour <br />SeniorEngineer.................................................................................................................................................. <br />$135/Hour <br />ProjectEngineer................................................................................................................................................. <br />$115/Hour <br />Engineering Senior CADD Technician................................................................................................................... <br />$95/Hour <br />Land Surveying & Mappin� Services <br />PrincipalSurveyor.............................................................................................................................................. <br />$165/Hour <br />ProfessionalLand Surveyor................................................................................................................................ <br />$125/Hour <br />ProjectSurveyor................................................................................................................................................ <br />$115/Hour <br />SurveyCADD / GIS Tech....................................................................................................................................... <br />$85/Hour <br />Survey Field Crew (1 -Man Crew).........................................................................................................................• <br />$92/Hour <br />SurveyField Crew (2 -Man Crew)........................................................................................................................ <br />$130/Hour <br />Survey Field Crew (3 -Man Crew)........................................................................................................................ <br />$160/Hour <br />Survey Crew with Laser Scan (3 -Man Crew)...................................................................................................... <br />$260/Hour <br />Landscape Architecture and Planning Services <br />Principal Landscape Architect / Principal Planner.............................................................................................. <br />$165/Hour <br />SeniorSupervising Landscape Architect............................................................................................................. <br />$150/Hour <br />SeniorLandscape Architect................................................................................................................................ <br />$135/Hour <br />LandscapeArchitect........................................................................................................................................... <br />$125/Hour <br />ProjectLandscape Designer............................................................................................................................... <br />$115/Hour <br />ProjectPlanner..................................................................................................................................................$115/Hour <br />Construction Administration Services <br />Director of Construction Management............................................................................................................. <br />$145/Hour <br />ConstructionManager ........... :........................................................................................................................... <br />$130/Hour <br />SeniofField Representative................................................................................................................................. <br />$95/Hour <br />FieldRepresentative............................................................................................................................................ <br />$85/Hour <br />Miscellaneous <br />Clerical................................................................................................................................................................. <br />$75/Hour <br />Hourly Charaes <br />Hourly work will be billed at our current prevailing rates; however, upon written notice and mutual agreement between the City <br />and Craven Thompson & Associates, these are subject to change due to increasing labor and material costs. Hourly work <br />performed outside of normal business hours will be billed at one and a half times the current rates for overtime. The firm's <br />normal business hours are from 8:00 a.m. to 5:00 p.m., Monday through Friday. <br />Lump Sum Fees <br />The Lump Sum Fees set forth above are applicable.for the period of four years as identified in RFQ No. 18-08-01 from the date <br />of this proposal. If the work on any item to which a lump sum fee shall apply is not commenced within said period, the firm <br />reserves7the right to terminate this Agreement as it relates to,said item. If the work is initiated but not concluded within said <br />period, regardless of the reason therefore, the balance of the fee due may be increased at the rate of one percent (1%) per <br />month for. each month the work continues until the work is complete or as mutually agreed to by the City and Craven <br />Thompson & Associates. <br />Cost Estimates <br />In that our firm does not have control over the cost of labor and materials, or over competitive bidding and marketing <br />conditions, the estimates of construction costs provided by our firm will be made on the basis of our experience and <br />qualifications, but our firm does not guarantee the accuracy of the estimates of probable cost as compared to the contractor's <br />bids. The firm recommends that you consult with the other professionals which you have employed in connection with the <br />project. <br />CRAVEN.1HOAOIPSON & ASSOCIMES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.