My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 4:38:54 PM
Creation date
3/15/2022 10:46:57 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3301
Date (mm/dd/yyyy)
02/17/2022
Description
2nd Amend w/Craven Thompson for Add'l Svcs to GS Utility Undrgd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Paul Abbott <br />CTA Proposal 2021-1.103.349 <br />October 19, 2021 <br />HourfvFee Schedule <br />Civil Engineering Services <br />Principal Engineer..............................................................................................................................................$200/Hour <br />Senior Supervising Engineer .............. ............................................ ... ............. I ........................... ........................ <br />WS/Hour <br />Senlor Englneer.................................... ....................................................................................... ................... —$135/Hour <br />Project Engineer.................................................................................................................................................$115/Hour <br />Engineering Senior CADD Technician ............................................. ......................................................................$95/Hour <br />Land Survevine & Mapping Services <br />PrincipalSurveyor............................................................................................................................................. <br />$165/Hour <br />Professional Land Surveyor................................................................................I............................................. <br />$125/Hour <br />Project Surveyor.., ...................................................................................................................... ....................... <br />$115/Hour <br />Survey CADD/ GISTech...................................................................................................................................... <br />$85/Hour <br />Survey Field Crew (1 -Man crew)....................................................................................................................... <br />$92/Hour <br />Survey Field Crew (2 -Man crew)........................................................................................... ....................... <br />$130/Hour <br />Survey Field Crew (3 -Man Crew).......................................................................................................................$160/Hour <br />Survey crew with Laser Scan (3 -Man Crew).................................................................................................... <br />$260/Hour <br />Landscape Architecture and Planning Services <br />Principal Landscape Architect/Principal Planner ............. ..................................................... ..... ....................... <br />$165/Hour <br />Senior Supervising Landscape Architect .......................................................................................................... <br />$150/Hour <br />Senior Landscape Architect, I .............................................................................. — ......................... $135/HDur <br />Landscape Architect............................................................ ........I...................................................................... <br />$125/Hour <br />Project Landscape Designer.............................................................................................................................. <br />$115/Hour <br />ProjectPlanner.................................................................................................................................................$115/Hour <br />Construction Administration Services <br />Director of Construction Management............................................................................................................. $145/Hour <br />construction Manager...................:.................................................................................................,1............... $130/1-Iour <br />Senior Field Representative................................................................................................................................. $95/Hour <br />FieldRepresentative.................................................................... ... ..................................................................... <br />$BS/Hour <br />Miscellaneous <br />Clerical................................................................................................................................................................. <br />$75/Hour <br />HourfvChomes <br />Hourly work will be billed at aur current prevailing rates; however, upon written notice and mutual agreement between the <br />City and Craven Thompson & Associates, these are subject to change due to increasing labor and material costs. Hourly work <br />performed outside of normal business hours will be billed at one and a halftimes the current rates for overtime. The firm's <br />normal business hours are from 8:00 a.m. to 5:00 p.m., Monday through Friday, <br />Lumo Sum Fees <br />The Lump Sum Fees set forth above are applicable for the period of four years as Identified In AFQ No. 18-08-01 from the date <br />ofthis proposal. if the work on any hem to which a lump sum fee shall apply is not commenced within said period, the firm <br />reserves the right to terminate this Agreement as it relates to said Item. Ifthe work Is Initiated but not concluded within said <br />period, regardless of the reason therefore, the balance of the fee due maybe Increased at the rate of one percent (1%) per <br />month for each month the work continues until the work Is complete or as mutually agreed to by the City and Craven <br />Thompson &Associates, <br />GostZrNmates <br />In that our firm does not have control over the cost of labor and materials, or over competitive bidding and marketing <br />conditions, the estimates of construction costs provided by our firm will be made on the basis of our experience and <br />qualifications, but ourfirm does not guarantee the accuracy ofthe estimates of probable cast as compared to the contractor's <br />bids. The firm recommends that you consult with the other professionals which you have employed In connection with the <br />project. <br />�RR`IIE�+I �1HC�dY1p.SS31V&a4$8C�GI.A1�5:'lNf><: <br />
The URL can be used to link to this page
Your browser does not support the video tag.