Laserfiche WebLink
-6 Eaton Power Pedestals installation only. <br />- Daily site cleanup <br />Exclusions: <br />1. No crane, rigging or scaffolding. <br />Z No permit or fling fees. <br />3. No bonding fees. <br />4. No cutting or patching. <br />S. No painting. <br />6. No waterproofing. <br />7. No equipment uses permits. <br />8. Concrete work, pad or bases. <br />9. Overtime work due to an accelerated schedule in which the normal. schedule <br />was imparted from other trades. <br />10. Additional insurance requirements exceeding (I Million/2 Million). <br />11. Not responsible incomplete lighting brackets set screws etc... <br />12. All work not specified on drawings. <br />Total: <br />$ 28,500.00 <br />All material is guaranteed to be as specified. All work to be completed in a workmanlike manner <br />according to standard practices. Any alteration or deviation from above specifications involving <br />extra costs will be executed only upon written orders, and will become an extra charge over and <br />above the estimate. All agreements contingent upon strikes, accidents or delays beyond our <br />control. Our workers are fully covered by Workmen's Compensation Insurance. <br />E/alio F0ue -&a <br />Signature <br />Note: This proposal maY be withdrawn by us if not uccepled ►vithin 30 clans. <br />221 <br />