|
42
<br />SECTION E Qualification Information and Assigned Personnel
<br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Jennifer Rogers-Pomaville Project Manager a. TOTAL b. WITH CURRENT FIRM
<br />16 16
<br />15. FIRM NAME AND LOCATION (City and State) Curtis + Rogers Design Studio, Inc. – Miami, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />FIU – Master of Landscape Architecture, 2007 LA0001721 – Florida – Landscape Architecture
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />International Society of Arborist
<br />19. RELEVANT PROJECTS
<br />a.
<br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Overseas Highway, Monroe County, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2012 2014
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Curtis + Rogers was involved in all facets of design services which included a PD&E study of the corridor along with design and construction
<br />documents, construction observation, attending pre-construction and progress meetings, plant selection, monthly inspections and reports,
<br />responding to RFIs, and field orders. Cost: $890,000
<br />b.
<br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Coconut Grove Streetscape Improvements, Coconut Grove, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2013 On-going
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The goal of the project was to review the existing problems with brick lifting and root intrusions in the sidewalks and evaluate existing tree
<br />conditions, while maintaining the existing wonderful character of Coconut Grove. A combination of solutions has been proposed and
<br />include new trees planted in conditions optimal for future growth, maintaining existing trees while improving their immediate growing
<br />environment and replacement of bricks set in a more suitable base material. Cost $6,000,000 - Phase I
<br />c.
<br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />City of Coral Gables Tree Succession & Irrigation Plan, Coral Gables,
<br />Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2012 2015
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Curtis + Rogers was hired by the City of Coral Gables to develop a Tree Succession and Initiation Plan for the trees in single family residential
<br />areas. The Curtis + Rogers team provided an evaluation of existing street trees, from a visual/horticultural condition. The trees where
<br />mapped, identified and conditions were added to them, and areas where trees were missing were identified as possible locations for tree
<br />replacements. Over 38,800 trees were evaluated. Curtis + Rogers attended community meetings to seek input and present preliminary
<br />findings. Ultimately the team created maps for street planting themes, and listed the trees needing immediate replacement, identified
<br />locations for new trees and recommended others for further evaluation in 5 years. Over 2500 trees are being replaced. This plan enabled
<br />the city to develop a program for systematic replacement of trees to ensure the longevity of the canopy – which characterizes the City
<br />Beautiful. Cost: $2,500,000 -$3,000,000 for initial implementation
<br />d.
<br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Southwest Streetscape and Street Tree Master Plan, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2018 2021
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This project addresses the interconnectedness of the City’s natural resources, current greening projects, as well as other on-going projects,
<br />including the Stormwater Masterplan, to propose possible solutions towards making the streets more resilient to sea level rise and global
<br />warming. At its conclusion, the goal for the project is to develop a blueprint for the City’s use as a tool for implementing greater resiliency
<br />within the street conditions of the project area. Cost: N/A
<br />e.
<br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Fisherman’s Community Hospital, Marathon, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2018 2021
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Curtis + Rogers worked with Nelson Architects and Baptist Health to design a new facility to serve the Keys well into the future. Temporary
<br />facilities were erected, and the project was completed in phases so that the community had medical services as the project was fast-
<br />tracked. Cost: $25,000,000
|