My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3297
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 11:29:26 AM
Creation date
3/17/2022 11:21:41 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3297
Date (mm/dd/yyyy)
02/17/2022
Description
Agreement with The Corradino Group for Planning & Zoning Services.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jeremy Mullings, AICP Senior Planner a. TOTAL b. WITH CURRENT FIRM <br />18 <br />15. FIRM NAME AND LOCATION (City and State) <br />CTS Engineering, Inc., Fort Lauderdale, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B. Sc. in Marketing, Florida Atlantic University, Boca Raton, FL, 2001 <br />B. Sc. in International Business and Trade, Florida Atlantic University, Boca <br />Raton, FL, 2001 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Institute of Certified Planners, American Planning Association, 2014 <br />19. RELEVANT PROJECTS <br />a. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />South Florida Commuter Services (SFCS) FDOT, Districts 4 and 6. PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Present <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Director. Leads all aspects of FDOT’s regional transportation demand management program. Region spans Indian River C ounty to <br />the Florida Keys. <br />b. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Transit System Safety and Security Review and “Check -Up,” FDOT, <br />District 4. <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2018 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Performed on -site and document reviews as a part of the triennial, comprehensive transit system safety and security <br />reviews of 6 transit agencies within FDOT’s District Four. <br />c. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />595 Express Bus Service, FDOT District 4. PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Oversaw and lead all activities to implement regional express bus service that operates within I -595 Corridor and I-95 <br />Managed Lanes. <br />d. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />595 Express Bus Park and Ride Network, FDOT Districts 4. PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Implemented three new park and ride lots to support the 595 Express Bus service utilizing three distinct st rategies. <br />BB&T Center Park and Ride Lot (Sunrise, FL) was implemented via three-party shared-use agreement preserving original event parking use <br />while availing part-time excess capacity to commuters. <br />e. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Park and Ride Lot Capital Improvements, FDOT District 4. PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Consultant Project Manager. Led the effort to analyze certain park and ride lots’ efficiency and effectiveness as it relates to present day <br />and projected conditions and volumes.
The URL can be used to link to this page
Your browser does not support the video tag.