Laserfiche WebLink
49 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Bruno Hernandez SUR/SUE Party Chief Jr. a. TOTAL b. WITH CURRENT FIRM <br />15 <br />15. FIRM NAME AND LOCATION (City and State) <br />CTS Engineering, Inc., Doral, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Naval Academy, Cuba <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certified Survey Technician Level I Entry <br />19. RELEVANT PROJECTS <br />a. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />FM 433109-5-62-01 CEI Services for I-95/SR 9 Express Lane Project from <br />South of Glades Road to South of Linton Blvd (CA275), District 4, Palm <br />Beach County <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2021 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />SUR/SUE Party Chief Jr. CEI Services for the I -95/SR 9 Express Lane Project from south of Glades Road to south of Linton Blvd and Glades <br />Road and Linton Blvd Interchange Improvements. <br />b. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />FM 446200-1-32-01 SR 820 West of NW 142 Ave to East of NW 118 Ave, <br />District 4, Palm Beach County <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2021 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />SUR/SUE Party Chief Jr. Design Survey of SR 820 west of NW 142 Avenue to east of NW 118 Avenue. <br />c. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Contract No. 17JEGI002, Project No. E15-WASD-04, Non-exclusive <br />Professional Services Agreement with Miami -Dade County Design of <br />Pump Station 62 Replacement, Miami -Dade County <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2021 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />SUR/SUE Party Chief Jr. Topographic Survey along NE 71 Street from NE 2 Avenue to NE 3 Avenue, and along NE 2 Avenue from NE 71 <br />Street going north up to 10’ North of the North Boundary line of the WASD property Folio No. 01 -3112-030-0050 from RW-to-RW line. <br />d. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />FM 441831-1-52-1 SR 826 Additional survey for areas along SR 826 <br />mainline from NW 25 Street to NW 67 Avenue, District 6, Miami -Dade <br />County <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2020 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />SUR/SUE Party Chief Jr. Design Survey of SR 826 additional survey for 12 areas along SR 826 mainline from NW 25 Street to NW 67 Avenue. <br />e. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Project No. A15-PROS-06, GIB ESP PROS Full Services PSA for Region D - <br />MDC Homestead Air Reserve Park Community Center and Park <br />Improvements, Miami-Dade County <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2020 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />SUR/SUE Party Chief Jr. Boundary and Topographic Survey for the Homestead Air Reserve Park (Miami -Dade County).