Laserfiche WebLink
55 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20.EXAMPLE PROJECT KEY NUMBER <br />1 <br />21. TITLE AND LOCATION (City and State) <br />North Miami Beach General Engineering & Planning Services <br />North Miami Beach, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />City of North Miami Beach <br />b. POINT OF CONTACT NAME <br />Judeen Johnson, Director of Public Works <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305.948.2916 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Project Description: The Corradino Group (Corradino) provided general planning and engineering services, as well as <br />transportation planning as needed. Corradino staff served as in house-staff for the Community Services department and <br />attended TRAD meetings for development review as needed. Additionally, Corradino serves as a peer reviewer for traffic <br />impact analyses, and the City also calls upon Corradino staff to assist with other studies such as ADA reviews, to serve on study <br />advisory committees such as for the City’s transportation master plan and parking analyses. <br />Corradino has provided, through this contract, Comprehensive Plan amendments, including water supply plan policies, and <br />recommendations for further changes. We have also provided revisions for the land development code, such as for fences, on <br />other items. <br />Corradino has also done the Comprehensive Operational Analysis for the City of North Miami Beach’s transit system. We <br />evaluated their transit system and introduced a plan that incorporated new transit lines. Analysis included investigating <br />connections with Sunny Isles Beach’s circulator. The project reviewed the system’s financial structure and projected demands <br />for the circulator to determine funding for the system. Three new routes were recommended to expand service to underserved <br />neighborhoods within the City. After the adoption of the report, assisted with Phase 2 implementation of two of the new <br />routes to take place in 2017. Implementation resulted in an increase in local ridership from 17,000 to 85,000 in the first year, to <br />185,000 un the second year, and to 223,000 in the third year. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />The Corradino Group, Inc. <br />2) FIRM LOCATION (City and State) <br />Miami, FL <br />3) ROLE <br />Prime