My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3297
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 11:29:26 AM
Creation date
3/17/2022 11:21:41 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3297
Date (mm/dd/yyyy)
02/17/2022
Description
Agreement with The Corradino Group for Planning & Zoning Services.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br />SECTION E Qualification Information and Assigned Personnel <br />RFQ # 21-11-01 PROFESSIONAL PLANNING AND ZONING CONSULTING SERVICES, CIVIL AND TRAFFIC ENGIEERING <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E for each key person.) Pg 1 <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Marvin Guillen, EI Roadway Complete Streets Design a. TOTAL b. WITH CURRENT FIRM <br />30 26 <br />15. FIRM NAME AND LOCATION (City and State) <br />The Corradino Group, Inc. – Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />BS (Civil Engineering, University of Miami, FL, 1987 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Guillen has 25 years of experience in the field of Civil Engineering. He has vast experience in highway design and municipal roadway street <br />design. He has prepared Technical Special Provisions and processed all the necessary permits for the construction of several projects. He has been <br />the Design Engineer for several interchanges for the Florida Department of Transportation and the designer of several roadway street projects for <br />the city of Hialeah and Miami-Dade County. <br />19. RELEVANT PROJECTS <br />a. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Oceana Bal Harbour Signalization Improvements <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing Ongoing <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. This project required engineering and permitting services with a complete set of construction documents and all required <br />permits required to construct the required signalization modification at the intersection of SR A1A / Collins Avenue and Harbor Way to <br />accommodate the proposed condominium development named the Oceana Bal Harbour. Work included the relocation of the pedestrian <br />signalization from the existing mast arms to proposed pedestrian signal pedestals located adjacent to the new crosswalk locations; new mast <br />arm and signalization controlled to replace the mast that is in conflict with the proposed north driveway to the property; replacement of all <br />signalization loops that are damaged by any of the roadway construction; Signal Operating Plan modifications as required through Miami- <br />Dade County Public Works and Waste Management Department’s Traffic Signals and Signs Division. <br />b. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />SR-907 / Alton Road Reconstruction <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing Ongoing <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Responsible for assisting in the design and preparation of the Traffic Control Plans detailing the maintenance of vehicular <br />and pedestrian traffic during the reconstruction of SR 907/Alton Road. The Traffic Control Plan from 43rd Street to Pine Tree Drive consists of <br />a 3 Phase approach which proposes a large/safe work zone while decreasing overall construction time. This segment also includes traffic <br />crossovers and temporary signalization. The Traffic Control Plan from Pine Tree Dr. to east of Allison Rd. consists of a 4 Phase approach which <br />also includes temporary signalization and details for the proper/safe maintenance of traffic upstream and downstream of a bascule bridge <br />adjacent to the project terminus. <br />c. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />SR-826 / Palmetto Expressway RRR <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2015 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Responsible for the design and preparation of contract documents detailing the RRR of SR 826/Palmetto Expressway from <br />its southern terminus at SR 5/US 1/S. Dixie Highway to just north of SR 878/Snapper Creek Expressway. The project also includes the <br />upgrading of substandard guardrail terminals, replacement of guardrail to bridge railing transitions (Bridge 870129), upgrading of bridge <br />railing with vertical face retrofit (Bridge 870129), replacement of bridge expansion joints and replacement of all pavement markings. <br />d. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />SR-997/Krome Avenue Interim Resurfacing <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2015 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Responsible for the design and preparation of contract documents detailing the maintenance resurfacing on 6 segments of <br />SR 997/Krome Avenue from SW 297th Street to SW 136th Street. Two of the projects are classified as RRR (434930-2 and 434930-6) and the <br />other four projects are classified as Pavement Only Projects (POP). These project are being performed in order to maintain and adequate <br />Pavement Condition Survey Rating prior to the widening of the SR 997/Krome Avenue corridor that will take place in 2021-2022. <br />e. <br />1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />FDOT D6, I-75 Express Lanes from County Line to SR-826 <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 2013 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Responsible for the design and plans preparation for design build RFP documents. The scope consisted in the adding two <br />express lanes in the I-75 median with an egress and an ingress access point.
The URL can be used to link to this page
Your browser does not support the video tag.