My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3302
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 2:41:22 PM
Creation date
3/29/2022 4:33:43 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3302
Date (mm/dd/yyyy)
02/17/2022
Description
Approving Agmt w/Architects Design Group (ADG) for space needs assessment & site feasibility study.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEER I SUSTAINABLE DESIGN I ADG has made a philosophical <br />commitment to sustainable architecture long before LEED came <br />Into existence, and has several team members who are LEED <br />Accredited Professionals. Additionally, our firm has numerous <br />projects which are LEED Certified, along with more in the <br />certification process. Whether the city decides to pursue official <br />certification, our team will design the building in a sustainable <br />manner using systemsthat reduce overall building maintenance <br />while complying with the projects budget. This is done by <br />implementing strategies such as optimizing energy use including <br />renewable energy generation, protecting and conserving water, <br />specifying appropriate and green building materials, enhancing <br />indoor environmental quality and day lighting strategies, <br />implementing waste management techniques, and optimizing <br />operational and maintenance practices. We recently completed <br />a station that included over 200 solar panels. <br />STAFF WELLNESS I Similar to LEED certification, which uses design features to make a building more environmentally friendly, WELL <br />interiors are designed to improve wellness and health for inhabitants, Given the high -stress environment of a police department, <br />particular attention needs to be paid to the circulation flow within the building and intuitive way finding in very large buildings. This <br />means providing adequate climate control, low noise levels, adequate task and ambient lighting, and using materials that do not add <br />pollutants to the interior environment and to not support microbial development. It also means providing the flexibility in furnishings <br />and amenities such as break rooms, physical agility spaces, and semi -private outdoor areas. We have also found that carefully located <br />break areas around major departments throughoutthe headquarters, can provide a watering hole for officers and staff to take a break <br />and de -stress without having to walk across the building or to another level, which increases overall productivity, <br />SECURITY 1 TECHNDLOGY I Security control is only one of the tools to provide <br />protection of evidence and staff. Established operational procedures including <br />"chain of custody" must also be established and followed to be successful. <br />Security measures include the following procedures to protect and preserve <br />the evidence: <br />• CCTV coverage and NVR hard drive storage of all areas including the intake, <br />storage, handling, and disposition times of evidence <br />• Separate controlled access rooms within the evidence facility for fire <br />arms, narcotics, and currency / valuables. For each of these spaces ADG <br />typically provides dual -credential access such as card and pin or card and <br />biometrics. Additionally, within the rooms we would provide motion detection, as well as infrared camera coverage <br />• Temperature and humidity sensors / alarms to security control, as well as connection to cell phones when settings are exceeded <br />for specific rooms or spaces <br />• Specific ventilation needs for areas where decomposition may occur <br />• Generator and UPS back up of key areas and equipment <br />Every design is crafted to allow flexibility for growth and change. Specialized systems for crime lab and public safety facilities include <br />integrated CCTV and security access control; CAT6 or 6A with Multimode and Single Mode fiber optics voice/video/data distribution; <br />public address system; intercom; CAN coax broadband distribution and audio/visual presentation systems. The facilities are provided <br />with redundant telecommunications services for an increase in survivability. As a support function, the facility does generally have the <br />need for a dedicated communications tower adjacentto the facility for Multiple RF radio systems. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.