Laserfiche WebLink
EyRESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />( Ampl:ete One Section Efor each koy. person), <br />12, NAME <br />13. ROLE IN THIS CONTRACT <br />14, YEARS OF EXPERIENCE <br />DEREK WASSINK, PE, RA, SI, LEED AP <br />STRUCTURAL ENGINEER <br />A. TOTAL <br />B. WITH CURRENT FIRM <br />30+ <br />6+ <br />15, FIRM NAME AND LOCATION (CITYAND STATE) <br />THORNTON THOMASETTI / FT LAUDERDALE, FL <br />16, EDUCATION (DEGREE AND SPECIALIZATION) <br />1Z CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />MASTER OF CIVIL ENGINEERING, PRINCETON UNIVERSITY <br />REGISTERED IN; FL, PA <br />18, OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING AWARDS, ETC) <br />Mr. Wassink joined Thornton Tomasetti in 2015 with more than 25 years of experience in structural design, project management and <br />coordination, and business development. His experience includes municipal, parking structures, and public safety structures, His <br />municipal and public safety experience is as extensive, as it is varied, Derek and ADG have worked on several award -winning public <br />safety projects together in Florida, <br />(1) TITLE AND LOCATION (CITYAND STATE) (2) YEAR'GOMPLETEQ <br />SARASOTA POLICE HEADQUARTERS & PARKING GARAGE (WITH ADG) PROFESSIONAL SERVICES CONSTRUCTION <br />SARASOTA, FL 2008 2011 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE., Structural Engineer -The 102,000-SFfacility includes spaces for professional standards, support services, internal affairs, <br />criminal investigations, property and evidence, and records, The building also includes 21,790 SF for crime scene investigations, <br />9,275 SF for forensics and evidence storage, and 2,860 SF for vehicle processing, A 200+ space, secured parking structure was <br />also incorporated on the constrained site, growing the building to 196,000 SF. <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />R), YEAR cOMPLETEU <br />SUNRISE PUBLIC SAFETY COMPLEX (WITH ADG) <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />SUNRISE, FL <br />2009 <br />2011 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Structural Engineer - ADG provided a detailed spatial needs assessment, master planning, cost estimating, design, and <br />construction administration services, Police divisions within the complex included administration, internal affairs, records, <br />detective's division, crime scene unit, crime analysis unit, property and evidence, victim advocacy program, patrol, SWAT, and <br />crisis negotiation unit, The facility design also included an evidence processing lab, located on the second floor across from the <br />evidence drop and storage area. The lab includes stainless steel counters, chemical resistant cabinets, epoxy flooring, a fume <br />hood, emergency eye wash, and various analysis equipment. <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />(7), YEAR COMPLETED, <br />CAPE CORAL POLICE HEADQUARTERS (WITH ADG) <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />CAPE CORAL, FL <br />2008 <br />I 2011 <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Structural Engineer - The City of Cape Coral selected ADG to provide programming, master planning, design, and <br />construction administration services, The new 100,755-SF headquarters provides the police department with state-of-the-art <br />facilities for their 345 employees and includes areas for administration, patrol, investigative services, professional standards, <br />communications, property and evidence, holding and processing labs, and a multitude of training facilities outfitted with the <br />necessary technology to be easily converted to the city's emergency operations center, The facility includes 3,200 SF for crime <br />scene investigations,11,425 SF for forensics and evidence storage, and 1,600 SF for vehicle processing. <br />(1) TITLE AND LOCATION (CITYAND STATE) <br />(2)`VEAR COMPLETED. <br />PEMBROKE PINES POLICE HEADQUARTERS DESIGN CRITERIA (WITH ADG) <br />PROFESSIONAL SERVICES <br />CONSTRUCTION <br />PEMBROKE PINES, FL <br />2017 <br />I N/A <br />(3) BRIEF DESCRIPTION (BRIEFSCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROLE; Structural Engineer -The ADG team was chosen to prepare a design criteria package for a new six -story Pembroke Pines <br />Police Department Headquarters. The 150,000-SF building is expected to have a 34,700-SF parking garage for 449 secured <br />spaces. The new state-of-the-art headquarters will include criminal investigations, professional standards and internal affairs, <br />SWAT, Homeland Security, K 9-unit, dive team, and drone unit. <br />32 <br />