Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />: ' <br />QUALIFICATIONS FOR THIS CONTRACT7 <br />(Present as many projects as requested by the agency, or to projects, if not specified: <br />8 <br />Complete.one Section F for each project.) <br />PROFESSIONAL SERVICES <br />SUNRISE PUBLIC SAFETY COMPLEX <br />CONSTBUCTIQN (IFAPPLICABLE) <br />2011 <br />SUNRISE, FL 2009 <br />23. PROJECT iINFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME <br />C.: POINT OF CONTACT PHONE NUMBER <br />CITY OF SUNRISE <br />SEAN VISNERS, DEPUTY <br />CHIEF <br />(954) 746 - 3370 <br />PROJECT► O• , <br />ADG was selected by the City of Sunrise for the design of a new 132,000-SF ..M t -- -r <br />Sunrise Public Safety Complex. The contracted scope of services included the <br />ii Ch 1t <br />development of a detailed spatial needs assessment, master planning, cost <br />estimating, design, and construction administration. The public safety complex ;I I ICI <br />was designed to house the entire operations of the Sunrise Police Department, the e i i <br />joint county / city 911 communications center (PSAP), fire -rescue administration <br />and training, municipal EOC, city-wide management information systems (MIS) <br />data center, and an eight -lane indoor firing range. <br />Police divisions within the complex included administration, internal affairs, <br />records, detective's division, crime scene unit, crime analysis unit, property and a " * = C '` _.° <br />evidence, victim advocacy program, patrol, SWAT, and crisis negotiation unit > d <br />The facility design also included an evidence processing lab, located on the <br />second floor across from the evidence drop and storage area. The lab includes <br />stainless steel counters, chemical resistant cabinets, epoxy flooring, a fume hood, j <br />emergency eye wash, and various analysis equipment. <br />The project site was located within the city's municipal complex. The existing <br />buildings located on -site provided a context for the design referenced through <br />colors, materials, and complimentary details, creating a unified sense of identity <br />within the complex, During the project planning phase, ADG examined vehicle <br />and pedestrian access, utility network, and overall site infrastructure connections <br />with modification recommendations to benefit current municipal complex <br />functionality and enhance future improvements, This project received the Eagle. <br />Award for Excellence in Construction, <br />(1) FIRM NAME (2), FIRM LOCATION (Chyand State) (3) ROLE <br />ARCHITECTS DESIGN GROUP <br />WINTER PARK, FL <br />ARCHITECT OF RECORD <br />(1) FIRM NAME. <br />(2) FIRM LOCATION (Cityand'State) <br />(3) ROLE <br />TLC ENGINEERING SOLUTIONS <br />ORLANDO, FL <br />SECURITY & TECHNOLOGY <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand:State) <br />(3) ROLE <br />DEREK WASSINK, PE (PREVIOUS FIRM) <br />FORT LAUDERDALE, FL <br />STRUCTURAL ENGINEERING <br />42 <br />