My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3302
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 2:41:22 PM
Creation date
3/29/2022 4:33:43 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3302
Date (mm/dd/yyyy)
02/17/2022
Description
Approving Agmt w/Architects Design Group (ADG) for space needs assessment & site feasibility study.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />CrrY OFOUANDO POLICE DEPARTMENT <br />OFFICE. of <br />December 9, 2015 JOHN W. MINA <br />C}IIEF OF POLICE <br />To Whom It May Concern. <br />I am pleased to be presented with the opportunity to express my appreciation to Architects Design Group <br />(ADG) as an outstanding architectural firm. I would strongly recommend the use of their talents and <br />abilities to perform any architectural, engineering and/or construction management activities on any facility. <br />In 2013, ADG, in association with H. J_ High Construction; renovated an old bank building for the use of the <br />Orlando Police Department's current Southwest Substation in Metrowest This project consisted of 3,000 <br />SF that replaced the antiquated substation located across the street that was under a yearly lease. The <br />design requirements by the City of Orlando included bullet proof entry using the existing teller glass in the <br />building; receptionist area protected by bullet proof glass; a briefing room and conference room; wireless <br />service ; one Captain office; four lieutenant offices; eight sergeant offices; and the replacement of the <br />existing HVAC system. The schedule for completion of the substation did not exceed the established <br />seven (7) months, including design time. ADG did however, exceed all of our expectations on the project. <br />On February 4, 2013, the Orlando Senhhel reported that Orlando City officials were exploring the idea of <br />building a new $40 million police headquarters and were already taking steps to obtain a 7,6-acre lot at <br />South Street and Orange Blossom Trial, where the new building would be built. ADG and H. J. High <br />Construction were again chosen as the Design -Build Team, and is well on its way to being completed at the <br />end of 2016. <br />ADG's team has spent many hours meeting with the Orlando Police Management Team and engaging all <br />OPD Staff in every step of the design build process. They have addressed our needs, acted efficiently to <br />design changes, and have been positive throughout the process working with an extremely tight budget on <br />FF&E. <br />Public buildings should reflect the community they represent. In my experience, ADG is one of the best in <br />the industry at achieving that goal. I would not hesitate to work with ADG on future projects, and I would <br />highly recommend them to other organizations without reservation. <br />Sin erel , <br />John W., Mina <br />Chief of Police <br />JMWlslm <br />PO BOX 913 a ORLANDO, FL 3ZB02•D913 <br />PHONE 407.246.2401 • FAX 407,246.3889 - CITYOPORLANDOMT <br />
The URL can be used to link to this page
Your browser does not support the video tag.