My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3302
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 2:41:22 PM
Creation date
3/29/2022 4:33:43 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3302
Date (mm/dd/yyyy)
02/17/2022
Description
Approving Agmt w/Architects Design Group (ADG) for space needs assessment & site feasibility study.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "C" <br />Spatial Needs Assessment and Site Feasibility Study <br />Sunny Isles Beach, FL <br />ADG Project No. 1082-22 <br />February 8, 2022 <br />Fee Allocation: <br />The following is the professional fee allocation for the various services defined in Exhibits "A" and "C". <br />1. Summary: <br />Phase One Services: <br />1.1 <br />I -A: Detailed Spatial Needs Assessment ...........................................$ <br />22,970.00 <br />1.2 <br />I-B: Staffing Study.............................................................................$ <br />18,996.00 <br />1.3 <br />I-C: Site Feasibility Study (3 Sites) ...................................................$ <br />21,846.00 <br />1.4 <br />I-D: Conceptual Building Design (Preferred Site) .............................$ <br />14,054.00 <br />1.5 <br />I-E: Preliminary Technology Report .................................................$ <br />6,090.00 <br />1.6 <br />I-F: Conceptual Architectural Site Planning (Preferred Site) ............ <br />$ 8,863.00 <br />1.7 <br />I-G: Preliminary Opinion of Probable Development Cost ................$ <br />5,240.00 <br />1.8 <br />I-H: Final Report & Presentation to the City Commission ................$ <br />3,174.00 <br />1.9 <br />Phase I Subtotal: .............................................................................. <br />$ 101,053.00 <br />1.10 <br />Phase I Reimbursable Expense Allowance: ....................................... <br />$ 3,000.00 <br />1.11 <br />Total Phase One Fee........................................................................$ <br />104,053.00 <br />Services to be Provided by the City: <br />1.12 I -I: Geotechnical Engineering <br />1.13 I-J: Site Surveying <br />1.14 I-K: Subsurface Existing Utility Locations <br />K:\1082 Sunny Isles Beach PD Study\ADMMSTRATION\1.21 - Contracts\Ian's Contract Files\Exhibit C - Fees And Hourly Rates 0208.2022.Docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.