My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 22-04-01 CITYWIDE FIBER NETWORK DEPLOYMENT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 22-04-01 Citywide Fiber Network Deployment
>
Specifications
>
RFP 22-04-01 CITYWIDE FIBER NETWORK DEPLOYMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:00:52 AM
Creation date
4/7/2022 10:00:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 22-04-01 17 <br /> <br />shall create an express warranty that the whole of the goods and/or services to be provided by <br />the bidder during the contract period shall conform to the sample submitted. The bidder <br />shall be required to provide adequate restitution to the City, in the manner prescribed by <br />the City, if this warranty is violated during the term of the contract. <br /> <br />2.16 CORRECTION OR REMOVAL OF DEFECTIVE WORK <br /> <br />If required by City, Contractor shall promptly, as directed and at its sole expense, either correct <br />all defective Work, whether or not fabricated, installed or completed, or, if the Work has been <br />rejected by City, remove it from the site and replace it with non-defective Work. Contractor shall <br />bear all direct, indirect and consequential costs of such correction or removal (including but not <br />limited to fees and charges of engineers, architects, attorneys and other professionals) made <br />necessary thereby. <br /> <br />2.17 CHANGE ORDER <br /> <br /> The Contract may only be changed by a Change Order approved by the City. Any <br /> increase or decrease in the Contract Price or adjustment in the Contract Time shall be based <br /> on written notice by the Contractor delivered promptly to the City (but in no event later than <br /> seven (7) days) after the acknowledgement or occurrence of the event giving rise to the claim <br /> and stating the general nature of the claim. Within fourteen (14) days thereafter, notice of the <br /> amount of the claim with all supporting data shall cover all amounts (direct, indirect and <br /> consequential) to which the claimant is entitled as a result of the occurrence of said event. All <br /> claims for adjustment in the Contract Price or Contract Time shall be determined by the City. <br /> <br /> The value of any Work covered by a Change Order or of any claim for an increase or <br /> decrease in the Contract Price or Contract Time shall be determined by: 1) mutual <br /> acceptance of a lump sum (which may include an allowance for overhead and profit) or 2) by <br /> application of unit prices contained in the Contract Documents to the quantities of the items <br /> involved. The City shall decide, in its sole discretion, whether to issue and agree to a Change <br /> Order, and verbal representations or instructions may not be relied upon by the Contractor. <br /> <br />2.18 DISCREPANCIES <br /> <br /> Should a Bidder find discrepancies or ambiguities in, or omissions from, the Drawings or <br /> Specifications, or should they be in doubt as to their meaning, they shall at once notify the <br /> City in writing. <br /> <br />2.19 DAMAGE TO PUBLIC OR PRIVATE PROPERTY <br />
The URL can be used to link to this page
Your browser does not support the video tag.