My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 22-04-01 CITYWIDE FIBER NETWORK DEPLOYMENT
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 22-04-01 Citywide Fiber Network Deployment
>
Specifications
>
RFP 22-04-01 CITYWIDE FIBER NETWORK DEPLOYMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 10:00:52 AM
Creation date
4/7/2022 10:00:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 22-04-01 44 <br /> <br />5.14 Locate Information <br />All splice points, vaults, hand hole/manhole, and conduit turns of 45-degrees or greater shall receive a <br />GPS coordinate that is marked and labeled back onto the as-built drawings. <br />5 Building Entrances <br />All building entrances should be checked and approved with The City of Sunny Isles Project Engineer or <br />liaison. Preference is given in the following order (but dictated by the facility itself): use of existing <br />entrance conduit, core drilling and bringing conduit up the outside of a facility, attaching a pull-box to the <br />exterior of said building and entering through the wall of the building. <br />5.16 Box Sizing <br />All boxes utilized MUST meet the FDOT applicable indexes and be on the FDOT approved equipment list. <br />Handholes shall be polymer composite Quazite brand or approved equal with a minimum tier 15, 20k load <br />rating. The following sizes are to be used unless specifically called out for in the design: <br />17x30x24 (20K Load) <br />24x24x24 (20K Load) <br />24x36x24 (20K Load) <br />30x48x24 (20K Load) <br />5.17 Box Spacing <br />Hand holes and vault spacing on backbone shall be installed as designed. If any adjustments in location of <br />hand holes needs to be made, new location needs to be pre-approved by the City or City representative <br />authorized to approve any adjustments. <br />As an overall guideline, hand hole spacing on the backbone shall be held to a maximum distance of 1,500’ <br />between handholes to assist in pulling and access to the network. Any 90-degree turn, major intersection <br />of place of future connectivity or splice locations will also require a hand hole or vault to be placed. <br />5.18 Box Placement <br />All hand holes and vaults shall be installed flush with the existing grade unless otherwise specifically <br />directed. Box installation shall include a 6” base or crushed stone or gravel for drainage purposes. Any <br />earth disturbed in the immediate area surrounding the box shall be compacted to avoid any future wash <br />outs. All box, hand holes, vault installations shall include all restoration. Box pricing shall also include <br />placement of all bolts to secure lid.
The URL can be used to link to this page
Your browser does not support the video tag.