<br /> 181ST ACTIVE PARK DRIVE APRIL 10,2005 '
<br /> I. The Contractor and the Surety,jointly and severally,bind themselves,their further notice the Owner shall be entitled to enforce any remedy available to the
<br /> heirs, executors, administrators, successors and assigns to the Owner for the Owner.
<br /> performance of the Construction Contact, which is incorporated herein by 6. After the Owner has terminated the Contractor's right to complete tl'
<br /> reference. Construction Contract, and if the Surety elects to act under Subparagraph 4
<br /> 2. If the Contractor perfonns the Construction Contract, the Surety and the 4.2,or 4.3 above,then the responsibilities of the Surety to the Owner shall not L.
<br /> Contractor shall have no obligation under this Bond, except to participate in greater than those of the Contractor under the Construction Contract, and the
<br /> conferences as provided in Subparagraph 3.1. responsibiHbea of the Owner to the Surety shall not be greater than those of the
<br /> 3. If there is no Owner Default,the Surety's obligation under this Bond shall Owner under the Construction Connect. To the limit of the amount of this Bond,
<br /> arise after: but subject to co.mdtmn by the Owner of the Balance of the Contract Price to
<br /> 3.1. The Owner has notified the Contractor and the Surety at Its address mitigation of costs and damages on the Construction Contract, the Surety is
<br /> described in Paragraph 10 below, that the Owner is considering obligated without duplication fon
<br /> declaring a Contractor Default and has requested and attempted to 6.1. The responsibilities of the Contractor for correction of defective
<br /> arrange a conference with the Contractor and the Surety to be held work and completion of the Construction Contract:
<br /> not later than fifteen days after receipt of such notice to discuss 6.2. Additional legal, design professional and delay costs resulting
<br /> methods of performing the Construction Contact. If the Owner, from the Connector's Default, and resulting from the actions or
<br />•
<br /> the Contractor and the Surety agree, the Contractor shall be failure to act of the Surety under Paragraph 4: and
<br />•
<br /> allowed a reasonable time to perform the Construction Contract, 6.3. Liquidated damages, or if no liquidated damages are specified in
<br /> but such an agreement shall not waive the Owner's right, B any, the Construction Contract, actual damages caused by delayed
<br /> subsequently to declare a Contractor Default: and performance or non-performance of the Contractor.
<br /> 3.2. The Owner has declared a Contractor Default and formally 7. The Surety shall not be liable to the Owner or others for obligations of the
<br /> terminated the Contractor's right to complete the contract. Such Contractor that are unrelated to the Construction Cohan,and the Balance of the
<br /> Contractor Default shall not be declared earlier than twenty days Contract Price shall not be reduced or set off on account of any such unrelated
<br />•
<br /> after the Contractor and the Surety have received notice as obligations. No right of action shall accrue on this Bond to any person or entity
<br /> provided in Subparagraph 3.1: and other than the Owner or its heirs,executors,administrators,or successors.
<br /> 3.3. The Owner has agreed to pay the Balance of the Contract Price to 8. The Surety hereby waives notice of any change,including changes of time,
<br />• the Surely in accordance with the terms of the Construction to the Construction Connect or to related subcontracts,purchase sodas and other
<br /> Contract or to a contractor selected to perform the Construction obligations.
<br /> Contract in accordance with the tams of the contract with the 9. Any proceeding, legal or equitable, under this Bond may be instituted in
<br /> Owns. any court of competent jurisdiction in the location in which the work or part of
<br /> 4. When the Owner has satisfied the conditions of Paragraph 3, the Surety the work is located and shall be instituted within two years after Contractor
<br /> shall promptly and at the Surety's expense take one of the following actions: Default or within two years after the Contractor ceased working or within two
<br /> 4.1, Arrange for the Contractor,with consent of the Owner,to perform yearn after the Surety refines or fails to perfonn its obligations under this Bond,
<br />• and complete the Corumatioi Contract: or whichever ocean Mc If the provisions of limitation available to sureties as a
<br /> 4.2. Undertake to perform and complete the Construction Contract defense in die jurisdiction of the suit shall be applicable.
<br /> itself,through its agents or through independent contactors: or 10. Notice to the Surety, the Owner or the Convector shall be mailed or
<br /> 4.3. Obtain bids or negotiated proposals from qualified contractors delivered to the address shown on the signature page.
<br /> acceptable to the Owner for a contract for performance and II, When this Bond has been furnished to comply with a statutory or other
<br /> completion of the Construction Contract,arrange for a contract to legal requirement in the location where the construction was to be perforce
<br /> be prepared for execution by the Owner and the contractor selected any provision in this Bond conflicting with said statutory or legal requirermc.
<br /> with the Owner's concurrence,to be seared with performance and shall be deemed deleted herefrom and provisions conforming to such statutory or
<br /> payment bonds executed by a qualified surety equivalent to the other legal requirement shall be deemed incorporated herein. The intent is that
<br /> bonds issued on the Construction Contract, and pay to thc Owner this Bond shall be construed as a statutory bond and not as a common law bond.
<br /> the amount of damages as described in Paragraph 6 in excess of the 12. Definitions.
<br /> Balance of the Contract Price incurred by the Owner resulting from 12.1. Balance of the Contract Price: The total amount payable by the
<br />' the Contractor's default: or Owner to the Contractor under the Construction Contract after all
<br /> 4.4. Waive its right to perform and complete, arrange for completion, proper adjustments have been made including allowance to the
<br />•
<br /> or obtain a new contractor and with reasonable promptness under Convects ofany amounts received or to be received by the Owner
<br /> the circumstances: in settlement of insurance or other claims for damages to which the
<br /> I. After investigation,determine the amount for which it may Contractor Ls entitled, reduced by all valid and proper payments
<br /> be liable to the Owner and, as soon as practicable after the made to or on behalf of the Contractor under the Construction
<br /> amount is determined,tender payment therefor to the Owner: Contract.
<br /> or 12.2. Construction Contract: The agreement between the Owner and the
<br /> 2. Deny liability in whole or in pat and notify the Owner citing Contactor identified on the signature page,including all Contract
<br /> reasons therefor. Documents and changes thereto.
<br /> 5. If the Surety does not proceed as provided in Paragraph 4 with reasonable 12.3. Contractor Default: Failure of the Contractor,which has neither
<br /> promptness,the Surety shall be deemed to be in default on this Bond fifteen days been remedied nor waived,to perforin or otherwise to comply with
<br /> after receipt of an additional written notice from the Owner to the Surety the tenor of the Construction Contract.
<br /> demanding that the Surety perform its obligations under this Bond, and the 12.4. Owner Default: Failure of the Owner, which has neither been
<br /> Owner shall be entitled to enforce any remedy available to the Owner. If the remedied nor waived, to pay the Contractor as required by the
<br /> Surety proceeds as provided in Subparagraph 4.4, and the Owner refuses the Consnction Contract or to perform and complete or comply with
<br /> payment tendered or the Surely has denied liability,in whole or in pan.without the other term thereof. '
<br /> (FOR INFORMATION ONLY—Name,Address and Telephone) '
<br /> AGENT or BROKER: OWNER'S REPRESENTATIVE(Architect,Engineer or other party):
<br /> I
<br /> 00601-2 '
<br /> EJCDC No. 1910-28A(1984 Edition)
<br /> Prepared through the joint efforts of the Surety Association of America,Engineers'Joint Contract Documents Committee,The Associated
<br /> General Contractors of America,American Institute of Architects,American Subcontractors Association,and the Associated Specialty
<br />' Contractors.