Laserfiche WebLink
• <br />• <br /> 181ST ACTIVE PARK DRIVE APRIL 10,2005 ' <br /> I. The Contractor and the Surety,jointly and severally,bind themselves,their further notice the Owner shall be entitled to enforce any remedy available to the <br /> heirs, executors, administrators, successors and assigns to the Owner for the Owner. <br /> performance of the Construction Contact, which is incorporated herein by 6. After the Owner has terminated the Contractor's right to complete tl' <br /> reference. Construction Contract, and if the Surety elects to act under Subparagraph 4 <br /> 2. If the Contractor perfonns the Construction Contract, the Surety and the 4.2,or 4.3 above,then the responsibilities of the Surety to the Owner shall not L. <br /> Contractor shall have no obligation under this Bond, except to participate in greater than those of the Contractor under the Construction Contract, and the <br /> conferences as provided in Subparagraph 3.1. responsibiHbea of the Owner to the Surety shall not be greater than those of the <br /> 3. If there is no Owner Default,the Surety's obligation under this Bond shall Owner under the Construction Connect. To the limit of the amount of this Bond, <br /> arise after: but subject to co.mdtmn by the Owner of the Balance of the Contract Price to <br /> 3.1. The Owner has notified the Contractor and the Surety at Its address mitigation of costs and damages on the Construction Contract, the Surety is <br /> described in Paragraph 10 below, that the Owner is considering obligated without duplication fon <br /> declaring a Contractor Default and has requested and attempted to 6.1. The responsibilities of the Contractor for correction of defective <br /> arrange a conference with the Contractor and the Surety to be held work and completion of the Construction Contract: <br /> not later than fifteen days after receipt of such notice to discuss 6.2. Additional legal, design professional and delay costs resulting <br /> methods of performing the Construction Contact. If the Owner, from the Connector's Default, and resulting from the actions or <br />• <br /> the Contractor and the Surety agree, the Contractor shall be failure to act of the Surety under Paragraph 4: and <br />• <br /> allowed a reasonable time to perform the Construction Contract, 6.3. Liquidated damages, or if no liquidated damages are specified in <br /> but such an agreement shall not waive the Owner's right, B any, the Construction Contract, actual damages caused by delayed <br /> subsequently to declare a Contractor Default: and performance or non-performance of the Contractor. <br /> 3.2. The Owner has declared a Contractor Default and formally 7. The Surety shall not be liable to the Owner or others for obligations of the <br /> terminated the Contractor's right to complete the contract. Such Contractor that are unrelated to the Construction Cohan,and the Balance of the <br /> Contractor Default shall not be declared earlier than twenty days Contract Price shall not be reduced or set off on account of any such unrelated <br />• <br /> after the Contractor and the Surety have received notice as obligations. No right of action shall accrue on this Bond to any person or entity <br /> provided in Subparagraph 3.1: and other than the Owner or its heirs,executors,administrators,or successors. <br /> 3.3. The Owner has agreed to pay the Balance of the Contract Price to 8. The Surety hereby waives notice of any change,including changes of time, <br />• the Surely in accordance with the terms of the Construction to the Construction Connect or to related subcontracts,purchase sodas and other <br /> Contract or to a contractor selected to perform the Construction obligations. <br /> Contract in accordance with the tams of the contract with the 9. Any proceeding, legal or equitable, under this Bond may be instituted in <br /> Owns. any court of competent jurisdiction in the location in which the work or part of <br /> 4. When the Owner has satisfied the conditions of Paragraph 3, the Surety the work is located and shall be instituted within two years after Contractor <br /> shall promptly and at the Surety's expense take one of the following actions: Default or within two years after the Contractor ceased working or within two <br /> 4.1, Arrange for the Contractor,with consent of the Owner,to perform yearn after the Surety refines or fails to perfonn its obligations under this Bond, <br />• and complete the Corumatioi Contract: or whichever ocean Mc If the provisions of limitation available to sureties as a <br /> 4.2. Undertake to perform and complete the Construction Contract defense in die jurisdiction of the suit shall be applicable. <br /> itself,through its agents or through independent contactors: or 10. Notice to the Surety, the Owner or the Convector shall be mailed or <br /> 4.3. Obtain bids or negotiated proposals from qualified contractors delivered to the address shown on the signature page. <br /> acceptable to the Owner for a contract for performance and II, When this Bond has been furnished to comply with a statutory or other <br /> completion of the Construction Contract,arrange for a contract to legal requirement in the location where the construction was to be perforce <br /> be prepared for execution by the Owner and the contractor selected any provision in this Bond conflicting with said statutory or legal requirermc. <br /> with the Owner's concurrence,to be seared with performance and shall be deemed deleted herefrom and provisions conforming to such statutory or <br /> payment bonds executed by a qualified surety equivalent to the other legal requirement shall be deemed incorporated herein. The intent is that <br /> bonds issued on the Construction Contract, and pay to thc Owner this Bond shall be construed as a statutory bond and not as a common law bond. <br /> the amount of damages as described in Paragraph 6 in excess of the 12. Definitions. <br /> Balance of the Contract Price incurred by the Owner resulting from 12.1. Balance of the Contract Price: The total amount payable by the <br />' the Contractor's default: or Owner to the Contractor under the Construction Contract after all <br /> 4.4. Waive its right to perform and complete, arrange for completion, proper adjustments have been made including allowance to the <br />• <br /> or obtain a new contractor and with reasonable promptness under Convects ofany amounts received or to be received by the Owner <br /> the circumstances: in settlement of insurance or other claims for damages to which the <br /> I. After investigation,determine the amount for which it may Contractor Ls entitled, reduced by all valid and proper payments <br /> be liable to the Owner and, as soon as practicable after the made to or on behalf of the Contractor under the Construction <br /> amount is determined,tender payment therefor to the Owner: Contract. <br /> or 12.2. Construction Contract: The agreement between the Owner and the <br /> 2. Deny liability in whole or in pat and notify the Owner citing Contactor identified on the signature page,including all Contract <br /> reasons therefor. Documents and changes thereto. <br /> 5. If the Surety does not proceed as provided in Paragraph 4 with reasonable 12.3. Contractor Default: Failure of the Contractor,which has neither <br /> promptness,the Surety shall be deemed to be in default on this Bond fifteen days been remedied nor waived,to perforin or otherwise to comply with <br /> after receipt of an additional written notice from the Owner to the Surety the tenor of the Construction Contract. <br /> demanding that the Surety perform its obligations under this Bond, and the 12.4. Owner Default: Failure of the Owner, which has neither been <br /> Owner shall be entitled to enforce any remedy available to the Owner. If the remedied nor waived, to pay the Contractor as required by the <br /> Surety proceeds as provided in Subparagraph 4.4, and the Owner refuses the Consnction Contract or to perform and complete or comply with <br /> payment tendered or the Surely has denied liability,in whole or in pan.without the other term thereof. ' <br /> (FOR INFORMATION ONLY—Name,Address and Telephone) ' <br /> AGENT or BROKER: OWNER'S REPRESENTATIVE(Architect,Engineer or other party): <br /> I <br /> 00601-2 ' <br /> EJCDC No. 1910-28A(1984 Edition) <br /> Prepared through the joint efforts of the Surety Association of America,Engineers'Joint Contract Documents Committee,The Associated <br /> General Contractors of America,American Institute of Architects,American Subcontractors Association,and the Associated Specialty <br />' Contractors. <br />