My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFRASTRUCTURE GROUP
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 22-04-01 Citywide Fiber Network Deployment
>
Responses
>
INFRASTRUCTURE GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 3:46:27 PM
Creation date
5/31/2022 3:46:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 22-04-01 51 <br /> <br />11. Discuss what strategies the submitter will utilize to keep this project on schedule. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />12. Discuss strategies the submitter will implement to ensure the project is kept on budget. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />13. Have you personally inspected the plans and location, are there any concerns that may impede <br />your performance on this project? <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />14. Describe the submitter’s attributes, which make the submitter best-suited for this project. <br /> <br /> <br /> <br /> <br /> <br />END OF SECTION <br /> <br />Our company will provide a schedule with man-power load to show completing <br />project on agreed upon time line, noting items with long lead times and adjusting <br />work load to complete milestone activities where applicable while long lead time <br />items are in manufacture / transit. <br />Our company will provide a schedule with man-power load to show completing <br />project on agreed upon time line, and in budget. While it was stated existing <br />conduit/raceways were in good condition, this could be the highest cost driver, if they <br />are found not to be viable while testing them prior to cable installation. This would be <br />discussed with City Management and a plan would be agreed to to move forward. <br />While any location(s) was under review/discussion, team members would be moved <br />to alternate locations to continue moving the project forward. <br />Yes, we have reviewed the plans and inspected the site. While it was stated existing <br />conduit/raceways were in good condition, this could be the highest cost driver, if they <br />are found not to be viable while testing them prior to cable installation. Key and <br />building access to the IT rooms. SIBPD logistics for assistance with our traffic control <br />plans for road closures and side walk closures. <br />Our company has completed numerous projects for our customers as they relate to <br />fiber optic cable installations. We have also installed numerous underground <br />conduit/raceways for DOTD and commercial/municipalities. With our current <br />workload we are not overstretched on manpower are are able to staff this project for <br />management and field craft work.
The URL can be used to link to this page
Your browser does not support the video tag.