Laserfiche WebLink
24 port rack mount panel 1 EA $ 304.11 304.11$ Original Qty: 10 <br />We calculated 1 from the drawings and splice document <br />48 port rack mount panel -EA -$ <br />96 port rack mount panel -EA -$ <br />144 port rack mount panel -EA -$ <br />288 port rack mount panel 4 EA $ 654.54 2,618.15$ Original Qty: 4 <br />Wall Mount Fiber Enclosure 7 EA $ 224.87 1,574.11$ We calculated 7 from the drawings and splice document <br />7ft Rack for patch panels -EA -$ <br />NEMA Enclosure 19 EA $ 1,139.40 21,648.66$ Original Qty: 10 <br />We calculated 19 from the drawings <br />Pigtail Cassets 12 $ 1,306.70 15,680.43$ We calculated 12 of these needed from the drawing and splice documents <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />PATCH PANELS AND CABINETS MATERIAL TOTAL $ 41,825.46 <br />AERIAL <br />Snow Shoes -EA -$ <br />U Guard -POLE -$ <br />Anchors -EA -$ <br />Guy Marker - Yellow plastic cover for visibility of down guy -EA -$ <br />New 35'-40' wooden pole for fiber attachments --$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />AERIAL MATERIAL TOTAL $ - <br />AERIAL - STRAND/LASH <br />Pole Attachment Hardware (Not needed if included in the labor price)-POLE -$ <br />Lashing Wire (Not needed if included in the labor price)-FT -$ <br />6M Strand -FT -$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />AERIAL - STRAND/LASH MATERIAL TOTAL $ - <br />AERIAL - ADSS <br />Pole attachment hardware -EA -$ <br />12, 24, 48ct Formed Wire Deadend Assembly -EA -$ <br />96ct Formed Wire Deadend Assembly -EA -$ <br />144ct Formed Wire Deadend Assembly -EA -$ <br />288ct Formed Wire Deadend Assembly -EA -$ <br />12, 24, 48ct Stackable Tangent -EA -$ <br />96ct Stackable Tangent -EA -$ <br />144ct Stackable Tangent -EA -$ <br />288ct Stackable Tangent -EA -$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />AERIAL - ADSS MATERIAL TOTAL $ - <br />WIRELESS <br />New 40' fiberglass pole for wireless deployment -EA -$ <br />New 40' Aluminum pole for wireless deployment --$ <br />Concrete Pad for Fiberglass and Aluminum pole --$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />--$ <br />WIRELESS MATERIAL TOTAL $ - <br />MATERIAL TOTAL $ 252,894.78 <br />GRAND TOTAL BID $662,728.62 <br />Description Unit Regular Rate OT/Holiday Rate Notes <br />Licensed Arborist HR Q.O. Q.O. Qualify out. <br />Licensed Surveyor HR Q.O. Q.O. Qualify out. <br />OSP Director HR 93.00$ 121.50$ <br />OSP Engineer HR 84.90$ 109.35$ <br />OSP Project Manager HR 93.00$ 121.50$ <br />OSP Inspector HR 93.00$ 121.50$ <br />OSP Permit Coordinator HR 68.70$ 85.05$ <br />OSP Materials Manager HR 68.70$ 85.05$ <br />Fiber Splicer & Tester HR 86.68$ 102.06$ <br />Construction Foreman HR 69.88$ 77.76$ <br />Machine Operators HR 61.48$ 72.90$ <br />General Construction Laborer HR 61.48$ 72.90$ <br />Traffic Control Plan by Certified Firm PG Q.O. Q.O. Qualify out. <br />Locate Paint Removal HR 48.52$ 53.46$ <br />Traffic Control as required when out of scope items requested HR 118.52$ 123.46$ <br />Railroad Flaggers - extra cost for crossing railroads have to hire railroad <br />employee flaggers HR Q.O. Q.O. Qualify out. <br />HR $ $ <br />HR $ $ <br />HR $ $ <br />HR $ $ <br />HR $ $