My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Unitec Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 22-04-01 Citywide Fiber Network Deployment
>
Responses
>
Unitec Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 3:48:49 PM
Creation date
5/31/2022 3:46:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
``i or Soo h`;r <br />QUALIFICATION REQUEST <br />INCLUDE WITH YOUR PROPOSAL <br />Contractor must list projects of similar project scope fulfilling the following qualification requests: <br />1. List Project Management Personnel. Personnel cannot be changed without written approval. <br />Project Manager Javier Parera <br />2. How many years has your organization been in business as a Contractor? <br />24 years <br />3. List minimum of two (2) previous similar construction projects, include: the Contractor's Project <br />Manager, Project Name, Owner, Project Address, Contact person, Phone, Contract Amount, Date of <br />Completion and Description of Work. <br />1. Felix Diaz. Project Manager Fiber Optic Connection between City Hall & Utilities Building City of Homestead <br />551 SE 8 ST, Homestead, FL 33030 (305) 224-4649 $87,500.00 March 2021 Installation of new conduit from <br />City Hall to Utilities Building. Installation of fiber optics cable from I.T.S. Telecom Room in City Hall to I.T.S. room <br />2 Mario Arava. Construction Manager. Lake Point Towers for Atlantic Broadband 1681 John F Kennedy Causeway <br />North Bay Village, FL 33141 (305) 697-7917 $152,939.00 December 2021 Installation of 24ct fiber using existing <br />conduit or sleeves for 14 risers thru A/C closets. 4,369' of 4" SDR Directional Bore along Hallandale Beach Blvd & <br />o en Isles . ra mounts, an ng. <br />4. List current workload. <br />Dibb Machuca. Project Manager Fiber Network Expansion Phase II City of Tamarac 6011 Nob <br />Hill Road Tamarac, FL 33321 (954) 597-3725 $1,146,070.00 July 2022 Expansion of high-speed <br />fiber network by installing new underground conduit and fiber connections including <br />termination and testing throughout the City of Tamarac's locations (City Hall, Water Treatment <br />Plant, Fire Mation ecrea ion Lenter, Last Pump Mation ana mainiancls Park. <br />I Initpr_it tha main C-nntrartnr fnr Rrt-p7phna (fnrmarly Atlantir Rrnadhand)_ Wt- haves nn�oine <br />work throughout the year completing plant expansions which includes boring and installing <br />conduit with mule tape and trace wire, installing handholes, pulling fiber, testing and <br />terminating. We are currently working on three p an expansions TFF—ougho-ut Miami Tacle. <br />City of Sunny Isles Beach I Request for Proposal No. 22-04-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.